2012:FLRToDo
From 1511Wookiee
Jump to navigationJump to search
This list is to track Robot/Controls activities that will be performed at FLR once the robot is uncrated and the pit crew can start working on the robot.
| Task | Team | Priority | Estimated Time |
| Mount and connect second turret sensor | Electrical | 15m | |
| Install conveyor chain tensioner | Mech | ||
| Replace beater bar resetting breaker with 20A fuse | Electrical | <5m | |
| Clean up wire from old flag sensors | Electrical | 10m | |
| Turret Encoder - make it work | Elec/Mech/Prog | 45m | |
| Realign Wing Potentiometer | Elec/Prog | 15m | |
| Phase B of Turrret to Side Car - Remove Drive Encoders | Elec/Prog | 15m | |
| Initial Sensor Ring Out | Elec/Mech/Prog | 30m | |