2013:Electrical Controls 01.26
From 1511Wookiee
Jump to navigationJump to search
Attendance
Start time: 10:00 am
End time: ??
Members present: Shayna R., Nick B., Eric A., Gafei S., Vlad B., Matt B., Kyle
Members Attending Next Meeting: ??
Tasks In Progress
- Define functionality on control functions.
- Verify current 3D model dimensions.
- Verify 3D model positions.
- Design dimensions for strap buckle on back side.
- Work with programming on dashboard interface.
Tasks to Complete
- Finish 3D model of controls in inventor.
- Post all needed parts on the team google doc. page
- Figure out control board (teensy?) selection.
- Map CONTROLS in a list.
Materials Needed
- Refer to the team google doc. or the BOM