Attendance

Start time: 10 am

End time: 9 pm

Members present: Alex Wolf, Mr. Wolf, Josh, Brianna Mancine

Members Attending Next Meeting:

Tasks Completed

  • here's the robot so far!

Jan 27 2013.jpg

  • DONE- check 54 inch cyl
  • DONE Alex- Design Black arm pivot
  • DONE Alex- Put in battery
  • DONE Alex -Add lightening holes all over the place
  • Done-  Revise part #002 with "far side" note
  • Done-  Redesign 002 elevator C chanel to accomodate "new" pyramid.
  • SENT OUT A LOT OF PARTS


Tasks In Progress

  • Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.
    • put in shopping list

Tasks to Complete

Release all fab parts 1/24/13

list and order all assembly hardware

DONE- check 54 inch cyl

DONE Alex- Design Black arm pivot

DONE Alex- Put in battery

Design release mechanism for red arms and black arms

Alex-   Design restraining mechanism for red arms and black arms

Brianna- Add sensors to model

Brianna- Design the cross member with leg guide for Red arms and Black arms

DONE Alex -Add lightening holes all over the place

Order all purchase parts

Combine all subteams parts and design the CG to be within +/- one inch from bot centerline

Use cross members to strengthen the elevator shafts

Belay attachment points

Done-  Revise part #002 with "far side" note

Done-  Redesign 002 elevator C chanel to accomodate "new" pyramid.

Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.

ON HOLD - transmission chain tentioner


Materials Needed

  • see google list