2009:Controls12109

From 1511Wookiee
Revision as of 18:11, 21 January 2009 by ElectricalControls (talk | contribs) (New page: Date: 1/21/09 Start Time: 6:30PM End Time: 9:00PM Members Present: Nic Maurer (Victor) <br>Tasks Completed: 1. Continued work on the model of the main control box. Main controls box s...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Date: 1/21/09

Start Time: 6:30PM

End Time: 9:00PM

Members Present: Nic Maurer (Victor)


Tasks Completed:

1. Continued work on the model of the main control box. Main controls box size was based on size of the hinge over the laptop.  Buttons will need to be shifted around. 


Tasks to Complete:
1. Determine if and how the new controls will fit on the flip out section of the main box, along with the driver interface. If necessary, removing the laptop as part of the main controls box was discussed.

2. Continue to model the main control box.