2009:Electrical Meeting 10.22

From 1511Wookiee
Jump to navigationJump to search

Attendance: Mike H, Tom P, Vaughn, Crystal V, Matthieu D, Andy M, Dave and Dave, Jeff.


Goals of the night:

  • Finish the Mouse repairs
  • fix the moue wire labels.


Mouse wire layout:

XA=AD2

XB=BD2

YA=AD1

YB=BD1


Progress and Completion:

  • Finished the mouse wire layout.
  • Filed the mouse, still needs a little bit of work.



Next week's meeting:

  • Rofl(Waffle)-Bot needs to be fixed
  • design a cover for the back of the control box
  • PUT MOUSE BALL BACK IN!!!
  • Mechanical gets to fix the mouse.