2009:Fabrication

From 1511Wookiee
Jump to navigationJump to search

How to Submit Parts

    In order to get parts made a drawing must be completed and the appropriate files must be submitted (see below for drawing and file requirements).  Please create a new link on this page (under files to be made) for each part request and include the proper drawing and required files.  Any questions at all, please ask Amy Averill 

    Drawing Requirements: (use the FIRST/Robotics drawing template under the English tab on the template menu).  Save a Copy As AUTOCAD .dwg (Autocad LT.)

                  List Material

                  State Quantity

                  Provide Overall Dimensions

                  Name of student who created the drawing

                  Current Date - this needs to be updated everytime a drawing is submitted to get parts made (this acts as the revision control)

                  *  If it is a sheet metal part to be bent, then the bend radius must be dimensioned along with the feature

                  * If the part will be welded, then care must be taken to design with the proper dimensioning scheme leaving room for the weldments

   File Requirements:

                 - Machined Parts (think parts with intricate surfaces) - .stp  

                 - OMAX Parts (think flat parts, bar stock to be cut to length) - .dxf

                                This is basically a stripped down version of the drawing.  It should include the face on view of the part (no other views) with no dimensions and should be scaled 1:1 and then use Save a Copy As and save as a .dxf Autocad LT.


Files to be made

Date Requested Item Requestor Ordered By/Date QTY  RX'd
2/3/09
trap door end
Cuyler McC

10
 IKE
2/3/09
shaft 750.idw
Cuyler McC
DXF mailed to Kim and given hard copy 2/3
8
IKE shop





 

 

 






NOTE:

2/3 - LEFT AND RIGHT FRAMES, WAITING FOR 1 X 1 SQUARE TUBING STOCK TO ARRIVE AT HARRIS SO FRAMES
CAN BE WELDED.  ACCORDING TO AMY, STOCK MIGHT BE ON SHIPPING DOCK.  SHE WILL CHECK TOMORROW MORNING.

MOST OTHER PARTS AT HARRIS ARE DONE AND AT HER DESK WAITING FOR WELDING.  Raw stock received 2/4/09. 


Order Status

Date Requested Item Requestor Ordered By/Date QTY  RX'd
1/16/09 mount_bumper Josh Gannon Gontarek - 1/16/09

 10 - dxf

1/20/09
1/23/09 gusset upper Alex Wolf Gontarek 1/23/09  4 -dxf 1/26/09
1/23/09 1.75 ball bearing block Alex Wolf Gontarek 1/23/09 2 - dxf 1/26/09
1/23/09 ball bearing block tall  Alex Wolf Gontarek 1/23/09 2 - dxf 1/26/09
1/23/09 ball bearing block Alex Wolf Gontarek 1/23/09 14 - dxf

1/26/09

1/23/09 pulley block (bearing block mount) resubmitted 1/27/09 for holes  Alex Wolf Gontarek 1/23/09 14 - dxf 1/28/09
1/23/09 gusset Alex Wolf Gontarek 1/23/09 4 -dxf 1/26/09
1/23/09 ball bearing block mid (bearing block mid 2) Alex Wolf Gontarek 1/23/09 2 - dxf 1/26/09
1/23/09 double pulley (ordered near net shape - Harris) Alex Wolf

Gontarek 2/2/09

12 - dxf 2/3/09
1/23/09 single pulley (ordered near net shape - Harris) Alew Wolf Gontarek 2/2/09 16 - dxf 2/3/09
1/26/09 span foot Alex Wolf Gontarek 1/26/09 2 - dxf 1/28/09
1/26/09 right ND motor mount Alex Wolf Gontarek 1/26/09 1 - dxf 1/28/09
1/26/09 cross member tie plate 1x1 Alex Wolf Gontarek 1/26/09 8 - dxf 1/28/09
1/26/09 conveyor drive motor mounting plate Alex Wolf Gontarek 1/26/09 3 - dxf 1/28/09
1/28/09 angle bracket Alex Wolf Gontarek 1/28/09 2 - dxf 1/30/09
1/29/09 cross member thread plug Alex Wolf Gontarek 1/29/09 14 - dxf 1/30/09
1/29/09 flip box (controls) Eric Averill Gontarek 1/29/09 1- dxf/weld 2/3/09
1/30/09 front door base Alex Wolfe Gontarek 1/30/09 1 - dxf 2/2/09
1/26/09 conveyor drive motor mount clamp Alex Wolf

Gontarek 1/26/09

DXF mailed to Kim and given hard copy 2/3

3 - stp IKE shop

single pulley Alex Wolfe

Blanks from Harris at PHS, DXF mailed to Kim and given hard copy2/3

16 IKE shop

double pulley Alex Wolfe Blanks from Harris at PHS, DXF mailed to Kim and given hard copy2/3 12 IKE shop
2/3/09
Top Bracket
Dean Smith

Gontarek 2/4/09
10
2/6/09
2/3/09
Drawer Bracket
Dean Smith
Gontarek 2/4/09
6
2/6/09
2/3/09
Bottom Plate
Dean Smith
Gontarek 2/4/09
1

2/6/09

2/3/09

Frame Cross Tie Weldment 2 Cuyler McChesney

Gontarek 2/4/09

Raw stock from PHS- parts to be welded

1   2/6/09
2/3/09 Frame Cross Tie Weldment 1 Cuyler McChesney

Gontarek 2/4/09

Raw stock from PHS - parts to be welded

4 2/6/09
2/3/09
Trap Door End

DXF mailed to Kim and given hard copy 2/3



2/3/09
Rear Coupling Aluminum Screw Lock

On assembly, no drawing made for it. Kyler working on it 2/4

2.5 Dia, x 1/2 thk with a bunch of taped holes

1
 ?









































Media:Parts_1-11-2009.xls

 

 

 

 

 

 

 

 











<u</u>

<u</u>

<u</u>

<u</u>

<u</u>



Parts Built Elsewhere

Date Part Name Where to Make Builder/Date QTY RX'd






2/3/09
helper finger
In House
On Job Shelf
4
done
2/3/09
banner sensor mounting plate.idw
In House
On Job Shelf
to mill slots
2
inproc.
2/3/09
banner sensor mount.idw
In House
On Job Shelf
to mill slots
2
inproc.
2/3/09
Frame Outrigger SubAssembly - Right Side.idw
In House
On Job Shelf
1
done
2/3/09
Frame Outrigger SubAssembly - Left Side.idw
In House
On Job Shelf
1
done
2/3/09
front door weldment.idw
In House
On Job Shelf
1
done
2/3/09
Lower crank.idw
In House
On Job Shelf
1
done
2/3/09
Upper crank.idw
In House
On Job Shelf
stock cut
1
inproc.
2/3/09
modAndyMarkhub.idw

In House

On Job Shelf
1
done
2/3/09
joint rod 1
In House
On Job Shelf
1
done
2/3/09
joint rod 2
In House
On Job Shelf
1
done
2/3/09
Banner Photo Eye Mounting Stand-Offs

In House

no drawing yet
Basically a thick washer

2
not
Started

2/4/09
30" Shaft (Trap Door Pivot Shafts)
In House

Drawing done 2/4.  Drawing
on job shelf

2

not
Started

2/4/09
Upper Plucker Motor Mount Plate
In House
Drawing done 2/4. Drawing
on job shelf
1
not
Started
2/4/09
Gear Coupling AL Lock
In House
Need to finsh drawing and check. Drawing on job shelf for cutting stock only
1
not
Started