2009:Electricla Main - 1.20.09
From 1511Wookiee
Jump to navigationJump to search
01.20.2009
Start time: 6:30
End time: 9
Members present: Rika, Michael, Crystal, Sean, Collin, Apples, Oranges
Tasks Completed:
- Gathering placement information [Battery is/should be official] In a settlement of weight balance. >>;; x3
- Created a basic idea of what the official electrical board mounting should look like
- Weighed Crio components, see below the measurements and weightings.
Tasks In Progress:
- Determination of Crio placement officially
- Collaberation with Programming team on sensor status due to the control changes. [As far as buttons go and whatnot]
Tasks to Complete:
- Official placement of electronics in a source of good balance.
- Switch transmission CIM Motors to 10 gauge wires.
- Solidify wiring system and get "floppier" wires for easy manuverablilty annnd Crystal's blood pressure is rising x3
- Batter DIAPER!!
- Determine mounting strategies as far as bolting/velcroing schtoof goes.
File:It Doesn't Die Chassis Mount
-Hopefully the mount for the electronics on the Chassis.. more to come. Courtesy of Colin. :D
**NOT FINAL!!!** BUT HOPEFULLY WILL BE. RAWR. >:3
Notes:
-Crio weight with 3 modules is 3.12 lbs.
-Distance between transmissions horizontally 11"
-Distance between transmissions vertically ~8"