2010:Drivetrain 01.20
From 1511Wookiee
Jump to navigationJump to search
XX.XX.2010
Start time:
End time:
Members present: Lizzy, Matt M. Ben S.
Members Attending Next Meeting:
Tasks Completed:
- hubs mounted to wheels
- school work
Tasks In Progress:
- same as 01/19/10
- same as 01/19/10
Tasks to Complete:
- same as 01/19/10
- same as 01/19/10
Materials Needed:
- Chassis brackets (8)
- motor mounts (4)
- front skid gaurds (2)
- rear skid guard (1)
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)