2010:Drivetrain 02.02
From 1511Wookiee
Jump to navigationJump to search
02.02.2010
Start time:5:00
End time:9:00
Members present:Gannon, Ben, Lizzy, Alex, Matt
Members Attending Next Meeting:
Tasks Completed:
- task
Main drivetrain buid
Tasks In Progress:
- task
Need to install Ball and wheel gaurds mount and gaurds
Tasks to Complete:
- Bumpers
Materials Needed:
- bumper materials
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Test Engineering Notebook Template