2010:Drivetrain 02.04
From 1511Wookiee
Jump to navigationJump to search
02.04.2010
Start time:6:30
End time:
Members present: Alex R. Ben S. Matt M. Lizzy
Members Attending Next Meeting:
Tasks Completed:
- Basic assemble complete
- Electrical board screwed on and hooked up
- Handed over to programming
Tasks In Progress:
- n/a - Ben is helping with controls, Lizzy, Alex, and Tom Cavaliere are inventorying new parts, and Matt is updating the wiki.
Tasks to Complete:
- Get the robot back
- Final assembly - still waiting on ball guard
Materials Needed:
- The last few parts
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Test Engineering Notebook Template