2010:Drivetrain 02.07

From 1511Wookiee
Jump to navigationJump to search

02.07.2010

Start time:10:30

End time:

Members present: Lizzy Matt M Ben S Alex R

Members Attending Next Meeting:

Tasks Completed:

  • Adjusted motor mounts - squared up frame, added spacers
  • Painted ball guard tube and wheel guard


Tasks In Progress:

  • Prep-work for assembly - waiting for wheel guards to dry


Tasks to Complete:

  • Assemble chassis with wheel guard


Materials Needed:

  • none

Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Test Engineering Notebook Template