2010:Electrical Main 02.09

From 1511Wookiee
Jump to navigationJump to search

02.09.2010

Start time: 6PM

End time: 9:30PM

Members present: Dave squared, Kevin, Vaughn, Mike H, Matthieu

Members Attending Next Meeting:

Tasks Completed:

  • Talked to Amy about getting lexan from Harris and looked at McMaster-Carr prices for backup.


Tasks In Progress:

  • Ordering Lexan


Tasks to Complete:

  • Electrical Board Design(1 or two pieces)
    * Build Electrical Board
    * Build covers for electrical board, and cRIO/radio area


Materials Needed:

  • LEXAN!!!


Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)