2010:Electrical Main 02.13

From 1511Wookiee
Jump to navigationJump to search

2.13.2010

Start time: 9:00am

End time: 9:00pm

Members present: Michael Hartman, Dave B., Tom Powers, Kevin Krech, Matthieu Dora


Tasks Completed:

  • Mounted components on the Electrical Board
  • Finished Electrical Board wiring (locally)
  • Discovered that the cRIO decided to go on a diet.



Tasks to Complete:

  • Update Jaguar Code
  • BOM updated to the new format
  • Make sensor wires



Materials Needed:

  • None

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)