2010:FieldCrate 01:31
From 1511Wookiee
Jump to navigationJump to search
1.31.2010
Start time: 11:00
End time: 7:00
Members present: Jason, Theo
Members Attending Next Meeting: Not sure
Tasks Completed:
- Assembled Remaining Goals
- Cut Ball Return Pipes
Tasks In Progress:
- Assemble Ball Returns
- Carpet the Bumps and Goal Ramps
- Mount the Remaining Foam
Tasks to Complete:
- Determine the connections of bumps and other items to the over all field
Materials Needed:
- Velcro (to be ordered Tuesday)
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Test Engineering Notebook Template