2010:FieldCrate 02:13

From 1511Wookiee
Jump to navigationJump to search

02.13.2010

Start time: 11:00am

End time: 9:00pm

Members present:  Jason, Theo, Kevin

Members Attending Next Meeting:  Jason, Theo, Amy


Tasks Completed:

  • moved 90% of field materials out of the pod
  • Assembled towers
  • assembled sections of bumps
  • assembled field rails
  • assembled alliance station walls
  • layed out regolith and field carpet



Tasks In Progress:

  • attaching ball returns
  • mounting vision targets
  • placing goals



Tasks to Complete:

  • assemble field in east gym for rally



Materials Needed:

  • item


Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)