2010:FieldCrate 02:13
From 1511Wookiee
Jump to navigationJump to search
02.13.2010
Start time: 11:00am
End time: 9:00pm
Members present: Jason, Theo, Kevin
Members Attending Next Meeting: Jason, Theo, Amy
Tasks Completed:
- moved 90% of field materials out of the pod
- Assembled towers
- assembled sections of bumps
- assembled field rails
- assembled alliance station walls
- layed out regolith and field carpet
Tasks In Progress:
- attaching ball returns
- mounting vision targets
- placing goals
Tasks to Complete:
- assemble field in east gym for rally
Materials Needed:
- item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)