2010:Integration 2.11.2010

From 1511Wookiee
Jump to navigationJump to search

Field

  • soccer nets were cut
  • Sat through Thursday set up field in cafe.  (Friday gym set up)
  • Will be painting this weekend


Electrical

  • Lexan has been ordered and will come in Monday
  • need to build covers
  • will convert the BoM into the official format
  • need final design for board placement - from mechanical


Controls

  • circuit board is almost done and ready to be programmed
  • joystick casing sent to Harris to be fabricated


Mechanical (hanger / superstructure)

  • winch is in the inventor design and needs to be coupled to the superstructure
  • superstructure mat'ls to be integrated in inventor and mat'ls must be purchased
  • weights are needed, CG must be calculated


Drive-train

  • ball guards exchanged for driveway poles! and clear bumps.
  • will drill new holes for the guards
  • back ball guard needs to be designed
  • poles need to be purchased tonight


Mechanical (Kicker)

  • the parts to be made at Ike's shop are all completed
  • sheet metal weldments are needed
  • need to know the size of the electrical board
  • need bumper supports from the drivetrain
  • weight and beater bar need to be accounted for - some parts ordered


Programming

  • need to know from Mech 1 how the hook is going to be operated and also need and image


Coverage for next week:

Tuesday through Friday - begin at noon - regular close time.

Tuesday - Jeff

Wednesday - Bear

Thursday - Cynette and Terri Mo.

Friday - Sharon, Lee, Dave V.