2010:Mechanical 1 01.23

From 1511Wookiee
Jump to navigationJump to search

01.23.2010

Start time: 10 am

End time: 10 pm

Members present: Mr. Kanzler, Shauna R, Becca H, Mr. Stoekel (sorry bout the spelling...)

Members Attending Next Meeting:


Tasks Completed:

  • weighted the components
  • decided on a design
  • mocked up and tested a pneumatic cylinder (took too long to extend)



Tasks In Progress:

  • researching types of gearboxes for the winch drive (worm drive arrangement)



Tasks to Complete:

  • make the design
  • determine final design
  • draw things in inventor



Materials Needed:

  • nope

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)