2010:Mechanical 1 01.23
From 1511Wookiee
Jump to navigationJump to search
01.23.2010
Start time: 10 am
End time: 10 pm
Members present: Mr. Kanzler, Shauna R, Becca H, Mr. Stoekel (sorry bout the spelling...)
Members Attending Next Meeting:
Tasks Completed:
- weighted the components
- decided on a design
- mocked up and tested a pneumatic cylinder (took too long to extend)
Tasks In Progress:
- researching types of gearboxes for the winch drive (worm drive arrangement)
Tasks to Complete:
- make the design
- determine final design
- draw things in inventor
Materials Needed:
- nope
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)