2010:Mechanical 2 02.06
From 1511Wookiee
Jump to navigationJump to search
Start: 9:00AM
End: 9:00PM\
Mike M., Alex W., Jake K
-We woeked more on inventor, we updadated the Bill of Materals and shipped 80% of the needed stuff to Harris.
-Finished th Beater Bar (Thrasher Bar) and the front ball stopper that uses two bended pieces of sheet metal and a lexan pannel.
-Continued to work in detailing the BOM and getting everything for the following week
-We have set up a work shop date with VanBortal supply (IKEs Workshop) on Monday.