2010:Mechanical 2 02.10
02.10.2010
Start time: pm
End time: pm
Members present:
Members Attending Next Meeting:
Tasks Completed:
Tasks In Progress:
task
task
Tasks to Complete:
Motor rotation sensors mounting and alignment strategy
Steel plate, no drawing, no material ordered (If we had material Ike could finish tonight or Tony maybe?)
Thrasher bar design not complete or checked
Electrical box mounting
Rotational senor spacer plate, design not checked, no material ordered
Kicker shaft not detailed yet
New 1/2 inch shaft for magnet mount not detailed yet (I think)
Design for surgical tube connecting pin not started. (2 inch piece of round aluminum should do it)
May need a Latch that is mirror image to be mounted to the other side of bot
Weldment for Kicker leg to Thunder foot spacer
Design for robot exterior (Skins)
--------------------------------------------------------------------------------
Materials Needed:
item
item
Do not forget to add your needed items to the Shopping List!!