2010:Programming 01:14
Calvin Drake, Justin Byers, Andy Melnick, Alex Ceci, Candido,
1/14/10 6:00-9:30
Accomplished:
-Worked more with the vision system, but it's difficult to use
-Andy worked on base code for the drive train (I believe)
-Alex worked on a dashboard
-Brainstormed with controls as to what kind of setup we're looking at
-Brainstormed with strategy as to what kind of autonomous modes are viable
In progress:
-Work with the camera more, see if it should even be considered for autonomous
-Test drivetrain code (Pending construction of drivetrain)
-Work on skeleton code (Pending finalization of what motors/speed controllers we're using)
Saturday:
-Finalize whether we should use the camera or not
-Test drive train code on thunderplucker (?)
People Attending:
Calvin Drake, Andy Melnick, Alex Ceci, (I believe) Justin Byers
Materials needed:
Robot
Blue-screened the main laptop once. :\