Attendance

Start time: 6:00

End time: 9:00

Members present: Mo, Matt, Ben, Paul

Members Attending Next Meeting: Hopefully the same

Tasks Completed

  • Built up two complete Cimple box transmissions with Cim motors with grease.  1 : 4.6667 ratio
    • Finished up basic frame design  currently 27.25" width to the frame x 37"
    • Currently using dual 12T off Cimple box to 30T for 1 : 2.5 ratio   Total drive ratio 1 : 11.7    Max speed 12.87 FPS   112.9 pushing force.
  • Larry ordered balance of drive train parts
  • Current model has wheel to sprocket dimension larger than desired.  Need to resolve.

Tasks In Progress

  • Verify what other parts are needed for chassis.
  • Mr. Cavaliere will order wheel parts and transmissions.

Tasks to Complete

  • Agree on chain routing and final gear to wheel spacing.
  • Start cutting and assembling chassis rails.

Materials Needed

  • Order 1/2" diameter carraige bolts X 7 long.  Need 6 min, should get 10 or 12.
    • sub-task
    • sub-task
  • task