Attendance
Start time: 6:00
End time: 9:00
Members present: Mo, Matt, Ben, Paul
Members Attending Next Meeting: Hopefully the same
Tasks Completed
- Built up two complete Cimple box transmissions with Cim motors with grease. 1 : 4.6667 ratio
- Finished up basic frame design currently 27.25" width to the frame x 37"
- Currently using dual 12T off Cimple box to 30T for 1 : 2.5 ratio Total drive ratio 1 : 11.7 Max speed 12.87 FPS 112.9 pushing force.
- Finished up basic frame design currently 27.25" width to the frame x 37"
- Larry ordered balance of drive train parts
- Current model has wheel to sprocket dimension larger than desired. Need to resolve.
Tasks In Progress
- Verify what other parts are needed for chassis.
- Mr. Cavaliere will order wheel parts and transmissions.
Tasks to Complete
- Agree on chain routing and final gear to wheel spacing.
- Start cutting and assembling chassis rails.
Materials Needed
- Order 1/2" diameter carraige bolts X 7 long. Need 6 min, should get 10 or 12.
- sub-task
- sub-task
- task