2011:Field 2/10/2011

From 1511Wookiee
Jump to navigationJump to search

Members present: Shayna and Manuel worked on chairman's and the robot

Mentors present: Amy, Lloyd


Members Attending Next Meeting:







Tasks Completed:

Task 1 - Create plates for rail rigidity

Task 2 - Sort through things to sell at Rally





Tasks In Progress:

Task 1 -

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Place Refelective Tape on poles

Task 2 - Drill holes for rail alignment

Task 3 - Determine what to do for extra 2" pole length

Task 4 - Wrap post bottoms with solid material

Task 5 - Mount post toppers

Task 6 - Determine/Construct method to keep lane dividers in place

Task 7 - Mounting system on player stations for power/connectivity

Task 8 - Drill holes in each player station for cords

Task 9 - Drill 1 hole in each piece of Lexan for securing

Task 10 - Sand down inside of feeder plates

Task 11 - Make sure we have enough Velcro







Materials Needed:


Item 1 - 4x4s

Item 2 - Hardware for rails




Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)