2011:Field 2/8/2011

From 1511Wookiee
Jump to navigationJump to search

Members present: Jason, Manuel, Shayna

Mentors present: Amy


Members Attending Next Meeting:




Tasks Completed:

Task 1 - Built structure for 1 shelving unit

Task 2 -



Tasks In Progress:

Task 1 - Cut shelves for shelving unit

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Build second shelving unit

Task 2 - Place Refelective Tape on poles

Task 3 - Drill holes for rail alignment

Task 4 - Create plates for rail rigidity

Task 5 - Determine what to do for extra 2" pole length

Task 6 - Wrap post bottoms with solid material

Task 7 - Mount post toppers

Task 8 - Determine/Construct method to keep lane dividers in place

Task 9 - Mounting system on player stations for power/connectivity

Task 10 - Drill holes in each player station for cords

Task 11 - Drill 1 hole in each piece of Lexan for securing

Task 12 - Sand down inside of feeder plates




Materials Needed:


Item 1 - 4x4s

Item 2 - Hardware for rails


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)