2011:Mechanical 1 2.8

From 1511Wookiee
Jump to navigationJump to search

Attendance

Start time: 5:30 PM

End time: 10:00 PM

Members present:

Mr. Vadas

Kyle Shuhart

Gabriel Rosenberg

Austin Lee

Alex Vadas

Members Attending Next Meeting:

All listed above

Tasks Completed

  • Milled the keystone pieces
  • MIlled down the rear guide wheel
  • Welded together two arms

Tasks In Progress

  • Continue milling of the rear guide wheel
  • DERP
  • Assembled main frame of robot

Tasks to Complete

  • Make two slides
  • Assemble parts

Materials Needed

none