2011:Mechanical 2 1.15
From 1511Wookiee
Jump to navigationJump to search
Attendance
Start time: 6:00
End time: 9:30
Date: 1/14/11
Members present:
Brianna M.
Ciana R.
Alex W.
Mr. W
Mrs. W
Members Attending Next Meeting:
Brianna M.
Ciana R.
Alex W
Mr. W
Mrs. W
Mr. K.
Tasks Completed
- Determined length and angle of gripper
- 1st test
- A: 8" (no) 7"(no) 6" ( worked poorly, and we had to push the tube in)
- B: 8"
- D: 2"
- 2nd test:
- A: 8"(no) 7"(no) 6"(worked poorly, and we had to push the tube in)
- B: 10"
- D: 2"
- Finshed game peices on inventor
Tasks In Progress
- tubbing or not
- manipulator prototyping
- sketching manipulators
Tasks to Complete
- tbd
Materials Needed
- tbd
DAY 2: 1/15/11
Attendance
Start time: 11:00 am
End time: 9:00 p.m.
Members present:
Brianna M.
Ciana R.
Jon G.
Alex W.
Mr. K.
Mrs. W.
Mr. W.
Members Attending Next Meeting:
Brianna M.
Ciana R.
Alex W.
Jon G.
Mr. W.
Mrs. W.
Mr. K.
Tasks Completed
- Using same idea as yesterday, but now using wheels instead of tubing
- Determined angle to be 50 degrees
- Determined height from ground, 1 1/2" which worked much better than 2"
- speeed of wheels
Tasks In Progress
- Finding shapes for frame
- Roughing up tires with sandpaper to increase coefficent friction
- Telescope vs. folding for starting configuringtion
Tasks to Complete
- tbd
Materials Needed
- tbd