2011:Mechanical 2 2.5

From 1511Wookiee
Jump to navigationJump to search

Attendance

Start time:

End time:

Members present: Alex W, Cianna R, Brianna M,Jacob K, Jhnathan G, Mr K, Mr W,

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

Sensor requrements.  DB, and Dave S.

  • arm park sensor,  when parked it's blocked.
  • 2 playing position, over travel sensors,  goes blocked when arm is too low.

Tasks to Complete


- Do we have a sprocket guard figured out yet for the top of the arm?
-  Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
5-   We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!

 - We don’t have a final design for the tusks or how they will be deployed yet.7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots?

 - Deployer park side side shield A   ALEX done
-  Deployer park side side shield B  ALEX done

  - Drawbridge TOM
-  Side electrical board supports, and place board CIANNA
-  Belly pan

1-  sensor brackets and flags 3

- arm release trigger

- parts inventory

2-  jack shaft details

       encoder on the jack shaft

 -  ASSEMBLE

-   put in electrical components and weight cg work.CIANNA

3-  MINI BOT HOLDER

4-  Light tower mount.


Materials Needed


ORDER BELT