2013:Climber 02.14
From 1511Wookiee
Jump to navigationJump to search
| Done | Measure moving hook postion to find interference |
| Done | Add reference marks to help locate moving hooks |
| Done | Wier tie chain |
| Done | Remove damaged tensioner |
| Done | Repair hook anghor (tape?) |
| 1/2 done | Add reinforcement to tensioner brackets (or redesign) |
| Done | Put on new tensioner bracket |
| 1/2 done | Make mount sensor brackets |
| Done Weight savings .8# | Lighten hooks |
| Done Weight savings .3# | Replace steel cleats with lightened vesion |
| Look at remoning two bearings from top shaft | |
| Done Estimated weight savings .4# | Finite element ananlyis of arms for lightening |