2010:Field/Crate: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
(45 intermediate revisions by 5 users not shown)
Line 1: Line 1:
== This is the Field/Crate Subteam's Engineering Notebook ==
= Master Task List =


'''1.06.2009'''  
#<strike>Complete 1 bump, 1 platform</strike><strike>, and 1 tower for team testing</strike>
#<strike>Purchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goals</strike>&nbsp;
#<strike>Complete rest of bumps (12) </strike>1/24
#<strike>Complete Goals&nbsp;and Goal Ramps (4)</strike>&nbsp;2/2
#<strike>Complete ball returns and towers&nbsp;</strike> (2)
#<strike>Make Tridents (2) </strike>1/23
#Create&nbsp;vision targets (4)&nbsp;
#<strike>Look to see if crate or alliance station walls need maintenance or improvment</strike>
#<strike>Verify that the crate dimensions are the same as last year.&nbsp; Determine if we need to alter the crate.</strike>''(Our crate is 48" x 48" x 69")<br>''


'''Start time:''' 6:45
''4.6.1.All Crates MUST:<br>1. Weigh less than 400 pounds when fully loaded.<br>2. "Sit" on 2 pieces of 4" x 4" lumber, spaced at least 28" apart so it can be moved by a forklift.<br>3. Have a footprint no greater than 4' x 4' and be no taller than 5'10" (70") high. This maximum includes the 4" x 4" lumber mentioned above.<br>4. Be constructed so it can withstand stacking during transport and storage.<br>5. Have “TEAM # XXXX” (insert your team number) painted or stenciled in letters at least 6” high on at least one side of the crate.&nbsp;'' <br>


'''End time:''' 8:45
#<strike>Make sure the crate still has the applicable shelves. </strike>''Shelves are in the close''t


'''Members present:''' Amy, Theo, Curtis, Karen
'''1/26''' '''Additions:'''  


<br> '''Tasks completed:'''  
#<strike>Determine carpet </strike>Purchased 1/30/10
#<strike>Determine coefficient of friction of spandex vs foam by its self</strike>&nbsp; Spandex will be used 1/30/10
#<strike>Create shopping list for ball returns</strike> Material bought on McMaster 1/28 and at Home Depot 1/30
#<strike>Assemble last goal front ramp</strike> 1/26
#<strike>4 angle pieces for front of goals</strike> 2/2
#<strike>Create tops for 3 goals</strike> 1/31
#Do we have enough soccer balls?(need 12) &amp; ball pump ''Theo will contact Phys. Ed. Dept for loan''<br>
#<strike>Look at full field current model- how to integrate goals- over goal wall with vision targets</strike>
#<strike>Goal netting for sides?</strike> Ordered 1/28
#<strike>Lag bolts for tower 4X4s</strike>&nbsp; Ordered 1/28 - McMaster
#Determine final connections of bumps, towers, and platforms to carpet and field sides
#<strike>Cut notches (2) in 4 bumps for tower 4X4 connections </strike>2/6
#<strike>Re-print 4 vision targets </strike>2/16
#<strike>''Our versions of the 3 remaining corrals''- Solution: Theo will provide construction fence (orange/plastic)</strike> 2/9<br>
#<strike>Need lots of strong velcro- hefty Hefty HEFTY</strike> Ordered from Mcmaster 2/4
#<strike>Carpet (12) bumps&nbsp;</strike> 2/6
#<strike>Wrap foam in spandex</strike>&nbsp; 2/3
#<strike>Attache Foam to inside of goals</strike> 2/6
#<strike>Determine Back frame for vision targets</strike>
#<strike>Fix (glue) trident that is currently not attached completely. </strike>2/7
#<strike>Cut soccer netting</strike>2/9


1.) Cut small PVC for outside uprights of trailer
<br>
 
2.) Began to cut large PVC for center column
 
3.) Began sketching out measurements on plywood sheet
 
<br>  
 
'''Tasks to complete:'''
 
1.) Finish cutting large PVC for center column
 
2.) Sketch and cut plywood for base
 
3.) Glue/assemble trailers
 
<br>
 
----
 
'''&nbsp;1.07.2009'''
 
Start time: 6:30
 
End time: 9:00
 
Members present: Amy, Theo, Kevin<br>
 
<br>Tasks completed:
 
1.) Finished cutting large PVC&nbsp;for center of trailer<br>
 
2.) Cut half of hexagonal luan plywood bases needed (6/12)<br>
 
3.) Cut lots of little 2x4 pieces for bumper supports<br>
 
4.) Sketched out bumper plywood measurements &amp; cut lines
 
<br>Tasks to complete:
 
1.) Cut other half of luan plywood bases<br>
 
2.) Cut out bumper plywood<br>
 
3.) Glue/assemble trailers
 
<br>
 
----
 
<br>'''1.08.2009'''
 
Start time: 6:20
 
End time: 9:00
 
Members present: Amy, Theo, Curtis<br>
 
<br>Tasks completed:
 
1.) Finished cutting hexagonal luan plywood bases<br>
 
2.) Cut metal for trailer tongues<br>
 
3.) Made template for holes to be cut in hexagonal bases<br>
 
<br>Tasks to complete:
 
1.) Drill/cut holes in 11 other trailer bases<br>
 
2.) Cut out bumper plywood


3.) Glue/assemble trailers <br>
= This is the Field/Crate Subteam's Engineering Notebook  =
 
<br>
 
----
 
<br>
 
'''1.10.2009'''
 
Start time: 10:00<br>
 
End time: 8:00<br>
 
Members present: Amy, Theo, Karen
 
<br>Tasks completed:
 
1.) Cut remaining pvc holes in trailer bases<br>
 
2.) Cut out plywood for bumpers<br>
 
3.) Cut out large hole in center of each base<br>
 
4.) Bought 20 sheets of "Regolith" flooring (it is being stored in the autoshop with the overpass and regular floor boards)<br>
 
5.) created template for attaching bumper plywood to mounting pieces<br>
 
<br>Tasks to complete:
 
1.) Attach bumper plywood to mounting pieces<br>
 
2.) Cut slots for wheel in bottom bases<br>
 
3.) Cut plywood/polycarbonate for vision targets <br>
 
4.) Glue/assemble trailers
 
<br>
 
----
 
<br>


'''1.10.2009'''
'''Week 1'''  


Start time: 10:00
2010:FieldCrate 01:10<br>2[[2010:FieldCrate 01:12|010:FieldCrate 01:12]]<br>[[2010:FieldCrate 01:13]]<br>[[2010:FieldCrate 01:14]]<br>[[2010:FieldCrate 01:16]]<br>[[2010:FieldCrate 01:17]]<br>


End time: 4:00<br>
'''Week 2'''<br>[[2010:FieldCrate 01:19]]<br>[[2010:FieldCrate 01:20]]<br>[[2010:FieldCrate 01:21]]<br>[[2010:FieldCrate 01:23]]<br>[[2010:FieldCrate 01:24]]<br>


Members present: Amy, Theo<br>
'''Week 3'''


<br>Tasks completed:
[[2010:FieldCrate 01:26]]<br>[[2010:FieldCrate 01:27]]<br>[[2010:FieldCrate 01:28]]<br>[[2010:FieldCrate 01:30]]<br>[[2010:FieldCrate 01:31]]


1.) Drilled mounting holes/cut wheel slots in trailer bases<br>
'''Week 4'''


2.) Attached bumper plywood to mounts<br>
[[2010:FieldCrate 02:02]]<br>[[2010:FieldCrate 02:03]]<br>[[2010:FieldCrate 02:04]]<br>[[2010:FieldCrate 02:06]]<br>[[2010:FieldCrate 02:07]]


3.) Cut pool noodles for one trailer<br>
'''Week 5'''


4.) Found bearings for trailer wheels, attached one wheel to axle and mounting piece<br>
[[2010:FieldCrate 02:09]]<br>[[2010:FieldCrate 02:10]]<br>[[2010:FieldCrate 02:11]]<br>[[2010:FieldCrate 02:13]]<br>[[2010:FieldCrate 02:14]]


<br>Tasks to complete:
'''Week 6'''


1.) Buy fabric for bumpers<br>
[[2010:FieldCrate 02:16]]<br>[[2010:FieldCrate 02:17]]<br>[[2010:FieldCrate 02:18]]<br>[[2010:FieldCrate 02:20]]<br>[[2010:FieldCrate 02:21]]


2.) Make bumpers<br>
Engineering Notebook Templates are available at: [[Engineering Notebook Template|Engineering_Notebook_Template]]<br>'''''Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!'''''


3.) Cut plywood/polycarbonate for vision targets
= Archives  =


4.) Glue/assemble trailers <br>
*[[2009:Field/Crate|2009 Field/Crate Main Page]]

Latest revision as of 15:47, 14 November 2010

Master Task List

  1. Complete 1 bump, 1 platform, and 1 tower for team testing
  2. Purchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goals 
  3. Complete rest of bumps (12) 1/24
  4. Complete Goals and Goal Ramps (4) 2/2
  5. Complete ball returns and towers  (2)
  6. Make Tridents (2) 1/23
  7. Create vision targets (4) 
  8. Look to see if crate or alliance station walls need maintenance or improvment
  9. Verify that the crate dimensions are the same as last year.  Determine if we need to alter the crate.(Our crate is 48" x 48" x 69")

4.6.1.All Crates MUST:
1. Weigh less than 400 pounds when fully loaded.
2. "Sit" on 2 pieces of 4" x 4" lumber, spaced at least 28" apart so it can be moved by a forklift.
3. Have a footprint no greater than 4' x 4' and be no taller than 5'10" (70") high. This maximum includes the 4" x 4" lumber mentioned above.
4. Be constructed so it can withstand stacking during transport and storage.
5. Have “TEAM # XXXX” (insert your team number) painted or stenciled in letters at least 6” high on at least one side of the crate. 

  1. Make sure the crate still has the applicable shelves. Shelves are in the closet

1/26 Additions:

  1. Determine carpet Purchased 1/30/10
  2. Determine coefficient of friction of spandex vs foam by its self  Spandex will be used 1/30/10
  3. Create shopping list for ball returns Material bought on McMaster 1/28 and at Home Depot 1/30
  4. Assemble last goal front ramp 1/26
  5. 4 angle pieces for front of goals 2/2
  6. Create tops for 3 goals 1/31
  7. Do we have enough soccer balls?(need 12) & ball pump Theo will contact Phys. Ed. Dept for loan
  8. Look at full field current model- how to integrate goals- over goal wall with vision targets
  9. Goal netting for sides? Ordered 1/28
  10. Lag bolts for tower 4X4s  Ordered 1/28 - McMaster
  11. Determine final connections of bumps, towers, and platforms to carpet and field sides
  12. Cut notches (2) in 4 bumps for tower 4X4 connections 2/6
  13. Re-print 4 vision targets 2/16
  14. Our versions of the 3 remaining corrals- Solution: Theo will provide construction fence (orange/plastic) 2/9
  15. Need lots of strong velcro- hefty Hefty HEFTY Ordered from Mcmaster 2/4
  16. Carpet (12) bumps  2/6
  17. Wrap foam in spandex  2/3
  18. Attache Foam to inside of goals 2/6
  19. Determine Back frame for vision targets
  20. Fix (glue) trident that is currently not attached completely. 2/7
  21. Cut soccer netting2/9


This is the Field/Crate Subteam's Engineering Notebook

Week 1

2010:FieldCrate 01:10
2010:FieldCrate 01:12
2010:FieldCrate 01:13
2010:FieldCrate 01:14
2010:FieldCrate 01:16
2010:FieldCrate 01:17

Week 2
2010:FieldCrate 01:19
2010:FieldCrate 01:20
2010:FieldCrate 01:21
2010:FieldCrate 01:23
2010:FieldCrate 01:24

Week 3

2010:FieldCrate 01:26
2010:FieldCrate 01:27
2010:FieldCrate 01:28
2010:FieldCrate 01:30
2010:FieldCrate 01:31

Week 4

2010:FieldCrate 02:02
2010:FieldCrate 02:03
2010:FieldCrate 02:04
2010:FieldCrate 02:06
2010:FieldCrate 02:07

Week 5

2010:FieldCrate 02:09
2010:FieldCrate 02:10
2010:FieldCrate 02:11
2010:FieldCrate 02:13
2010:FieldCrate 02:14

Week 6

2010:FieldCrate 02:16
2010:FieldCrate 02:17
2010:FieldCrate 02:18
2010:FieldCrate 02:20
2010:FieldCrate 02:21

Engineering Notebook Templates are available at: Engineering_Notebook_Template
Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!

Archives