2012:Drivetrain: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(7 intermediate revisions by one other user not shown)
Line 1: Line 1:
= Resources  =
= Resources  =


http://penfieldrobotics.com/wiki/images/6/6b/ForeDiagramWheelsAligned.jpg
= Drivetrain Master Task List  =


[http://penfieldrobotics.com/wiki/images/6/6f/WheelsBelowFrame.jpg http://penfieldrobotics.com/wiki/images/6/6f/WheelsBelowFrame.jpg]
*Assemble Gearbox and Motor Assembly
*Determine Wheel Spacing
*Decide on Symmetric or Asymmetric Chassis Design
*Decide on Wheels or Skidplate for Barrier Crossing
*Finalize Drivetrain Design
*Fabricate E(pic)-brackets
*Assemble Chassis/Chains/Gearbox for Preliminary Tests
*Run Preliminary Chassis Tests on Field
*Attach Electrical Board To Chassis
*Weld Chassis


= Drivetrain Master Task List  =
= Drivetrain Design Details =  
 
* Classic 6-wheel, chain driven from central motor/gearbox
* Pneumatic tires
* Dual CIM motor drive
* Speed controllers on all motors
* <span style="color:red">Need transmission details</span>
* <span style="color:red">Need gearing details</span>
* Encoder on each side <span style="color:red">Need encoder part # or details as well as mount location</span>




= Drivetrain Subteam's Engineering Notebook  =
= Drivetrain Subteam's Engineering Notebook  =


== Week 1==
== Week 1 ==


* [[2012:Drivetrain 01.14|1/14]]
*[[2012:Drivetrain 01.14|1/14]]


== Week 2==
== Week 2==

Latest revision as of 20:28, 18 January 2012

Resources

Drivetrain Master Task List

  • Assemble Gearbox and Motor Assembly
  • Determine Wheel Spacing
  • Decide on Symmetric or Asymmetric Chassis Design
  • Decide on Wheels or Skidplate for Barrier Crossing
  • Finalize Drivetrain Design
  • Fabricate E(pic)-brackets
  • Assemble Chassis/Chains/Gearbox for Preliminary Tests
  • Run Preliminary Chassis Tests on Field
  • Attach Electrical Board To Chassis
  • Weld Chassis

Drivetrain Design Details

  • Classic 6-wheel, chain driven from central motor/gearbox
  • Pneumatic tires
  • Dual CIM motor drive
  • Speed controllers on all motors
  • Need transmission details
  • Need gearing details
  • Encoder on each side Need encoder part # or details as well as mount location


Drivetrain Subteam's Engineering Notebook

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Engineering Notebook Templates Available at:Engineering_Notebook_Template

Please Label All Notebook Pages 2012:Drivetrain XX.XX to avoid confusion.

Archives