2012:Drivetrain 01.24

From 1511Wookiee
Jump to navigationJump to search

Attendance

Start time:

End time:

Members present: Members Attending Next Meeting:

Tasks Completed

  • drivetrain completion.
  • electrical board installation
  • Design improved
  • inventor drawings updated.
  • discussed position for electrical board
  • designed battery frame at the back of the drivetrail

[1] [2]

Tasks In Progress

  • 2nd drive train fabrication

Tasks to Complete

  • the ones that arent done yet.

Materials Needed

  • task
    • sub-task
    • sub-task
  • task