2012:Drivetrain 01.24: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
Mechanical1 (talk | contribs) |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
= Attendance = | = Attendance = | ||
Line 7: | Line 6: | ||
'''Members present: ''' | '''Members present: ''' | ||
'''Members Attending Next Meeting: ''' | '''Members Attending Next Meeting: ''' | ||
= Tasks Completed = | = Tasks Completed = | ||
* | *drivetrain completion. | ||
** | *electrical board installation | ||
** | *Design improved | ||
* | *inventor drawings updated. | ||
*discussed position for electrical board | |||
*designed battery frame at the back of the drivetrail | |||
[http://penfieldrobotics.com/wiki/index.php?title=File:Rear_pannel.png] | |||
[http://penfieldrobotics.com/wiki/index.php?title=File:Rear_isometric_electircal.png] | |||
= Tasks In Progress = | = Tasks In Progress = | ||
* | *2nd drive train fabrication | ||
= Tasks to Complete = | = Tasks to Complete = | ||
* | *the ones that arent done yet. | ||
= Materials Needed = | = Materials Needed = |
Latest revision as of 18:57, 24 January 2012
Attendance
Start time:
End time:
Members present: Members Attending Next Meeting:
Tasks Completed
- drivetrain completion.
- electrical board installation
- Design improved
- inventor drawings updated.
- discussed position for electrical board
- designed battery frame at the back of the drivetrail
Tasks In Progress
- 2nd drive train fabrication
Tasks to Complete
- the ones that arent done yet.
Materials Needed
- task
- sub-task
- sub-task
- task