2013 ControlsToDoList: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(Created page with "This is a list of things that need to be done to complete the operator controls when the metalwork arrives. This list should be executed in order (1, 2, 3...) so that the control...")
(No difference)

Revision as of 10:08, 9 February 2013

This is a list of things that need to be done to complete the operator controls when the metalwork arrives. This list should be executed in order (1, 2, 3...) so that the controls are assembled correctly.

1. Drill mounting holes for various control functions.

         - Joysticks
         - eStop Control Board