2023:Electrical Main: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary Tag: visualeditor |
Programming (talk | contribs) Tag: visualeditor |
||
(46 intermediate revisions by 3 users not shown) | |||
Line 15: | Line 15: | ||
40amp REV | 40amp REV | ||
<u>Pneumatics:</u> | |||
Green: Changing Pressures | |||
Yellow: High Pressure | |||
Blue: Low Pressure | |||
White: Extend | |||
Black: Retract | |||
== Electrical Wiring Diagrams: == | == Electrical Wiring Diagrams: == | ||
Line 40: | Line 52: | ||
=== <u>Potential CAN Chain (1/21/23)</u> === | === <u>Potential CAN Chain (1/21/23)</u> === | ||
[[File:Potential CAN Chain.jpg|alt=|704x704px]] | [[File:Potential CAN Chain.jpg|alt=|704x704px]] | ||
==== Current CAN Chain Plan (2/11/2023) ==== | |||
== [[File:2-11 can bus.jpg|frameless|710x710px]] == | |||
== '''Daily Status''' == | == '''Daily Status''' == | ||
Line 57: | Line 73: | ||
*To-Do | *To-Do | ||
**Finish rewiring CANcoder A (on black shelves) | **Finish rewiring CANcoder A (on black shelves) | ||
**Terminate and Label Motor Side and CAN Connection of Swerve Drive Spark Max (45A) | |||
**Terminate and Label Motor Side and CAN Connection of Swerve Rotation Spark Max (30A) | |||
**Continue to work with Lift/Gripper on sensor placement (ensure some level of adjustability) | |||
**Rough out locations of Speed Controllers | |||
**Update IO Map | |||
=== 1/22/2023 === | |||
* Accomplished | |||
** Wired, labeled, and CAN IDed the 8 drive motor controllers | |||
** Figuring out Battery Things | |||
** Talked with Acquire about beam break placement | |||
** Electrical Component placement in CAD started | |||
** Found an Ethernet Switch (not the right one) | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Figure out sensors with Lift | |||
** Quality check motor controllers | |||
** Finish rewiring CANcoder A (on black shelves) | |||
** Order a more industrial Ethernet Switch | |||
*** | |||
=== 1/24/2023 === | |||
* Accomplished | |||
** Quality checked drive motor controllers | |||
** Finished rewiring CANcoder A (on black shelves) (questionable condition). | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Figure out sensors with Lift | |||
** Test CANcoder A (on black shelves) to confirm integrity of the components | |||
** Order a more industrial Ethernet Switch | |||
*** | |||
=== 1/25/2023 === | |||
* '''MEETING CANCELLED''' | |||
** | |||
=== 1/26/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 1/28/2023 === | |||
* Accomplished | |||
** Order a more industrial Ethernet Switch | |||
** Put away some stuff | |||
** Post testing, install CAN Encoders to the swerve modules | |||
** Fixed batteries | |||
** Test CANcoder A (on black shelves) to confirm integrity of the components | |||
*** Both Encoders A & B work with the modules | |||
** Figure out sensors with Lift | |||
*** Flag sensors at either side of the base telescope | |||
**** | |||
* To-Do | |||
** Update IO Map | |||
** Finalize motor controllers for the not drive base mechanisms and prep them | |||
** Give a PSA about battery usage (Planning to do it Dinner on Tuesday) | |||
=== '''1/29/2023''' === | |||
* Accomplished | |||
** Talked about alternate component places | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Finalize motor controllers for the not drive base mechanisms and prep them | |||
** Check up with Gripper about Beam Break mounting | |||
=== 1/31/2023 === | |||
* Accomplished | |||
** 3d printed Beam Break mount for Gripper | |||
** Continued Component Placement | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Finalize motor controllers for the not drive base mechanisms and prep them | |||
*** | |||
=== 2/1/2023 === | |||
* Accomplished | |||
** Continued component placement | |||
*** Need more info to finalize accumulators | |||
**** | |||
* To-Do | |||
** Update IO Map | |||
** Finalize motor controllers for the not drive base mechanisms and prep them | |||
*** | |||
=== 2/2/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/4/2023 === | |||
* Accomplished | |||
** Accumulators are horizontal with 3d printed triangle brackets being made | |||
** Electrical placements are mostly finalized | |||
** Finalize motor controllers for the not drive base mechanisms and prep them | |||
** Worked with DB on Protective/Sponsor Pannels | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Terminate the batteries when the terminator things come in | |||
** Id non drive base motor controllers | |||
*** | |||
=== 2/5/2023 === | |||
* Accomplished | |||
** Id non drive base motor controllers | |||
** Prepared the compressor | |||
** Terminated 5 of the batteries that we had the lugs for | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Terminate the batteries when the terminator things come in | |||
** Figure out how to mount compressor | |||
** Prepare the rest of the pneumatics | |||
*** | |||
=== 2/7/2023 === | |||
* Accomplished | |||
** Disassembled 3 port manifold and PCM from 2022 | |||
** Worked on potential mountings for components | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Terminate the batteries when the terminator things come in | |||
** Figure out how to mount compressor | |||
** Prepare the rest of the pneumatics | |||
*** | |||
=== 2/8/2023 === | |||
* Accomplished | |||
** Terminated gripper motors | |||
** Beam Break on gripper is mounted | |||
** Working on figuring out electrical paneling | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Terminate the batteries when the terminator things come in | |||
** Figure out how to mount compressor | |||
** Prepare the rest of the pneumatics | |||
** Map out placement for components | |||
*** | |||
=== 2/9/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/11/2023 === | |||
* Accomplished | |||
** Mounted a lot of electrical components | |||
** Planned out component placement | |||
** Updating physical copy of the robot IO map | |||
** Mounting compressor to the belly pan | |||
** Planned Manifold (6, I believe we are doing 4 doubles with 2 blocks) | |||
** Put together manifold solenoids and blocks | |||
** Wiring Drive Base motors to PDH | |||
** Figured out motor controller placement for Acquisition | |||
** Figured out IGUS situation | |||
** Situated the Ball Screw motor controllers | |||
** Terminated some Batteries | |||
** Mounted the breaker | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Finish terminating the batteries | |||
** Mount compressor | |||
** Prepare the rest of the pneumatics | |||
*** mount manifold and pcm | |||
** Test the compressor for air retention | |||
** Mount accumulator panel | |||
** Mount radio on lift posts | |||
** Wire CAN Chain with new plan | |||
** Plug CAN encoders into vrm | |||
** Mount Gripper motor controllers | |||
** Figure out Flag sensors | |||
** Talk to gripper about beam breaks | |||
** Mount ethernet switch and Pi | |||
** Build in a quick disconnect for the pneumatics | |||
** Regulate IGUS chain length | |||
** Put the accumulators on the panel and make them work | |||
** Put in the pneumatics regulators | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
*** | |||
=== 2/12/2023 === | |||
* Accomplished | |||
** 2023 Competition batteries are done | |||
** Plug CAN encoders into vrm | |||
** Gripper had the addition of a second piston for the wrist- we're going to have to do some silly things | |||
** Finished drive base plus ball screw can chain | |||
** Ethernet Switch, Pi, and VRM are on robot | |||
** Lift had to remove posts from robot so the motor controller at the base is offline at the moment | |||
*** | |||
* To-Do | |||
** Update IO Map | |||
** Mount compressor | |||
** Prepare the rest of the pneumatics | |||
*** mount manifold and pcm | |||
** Test the compressor for air retention | |||
** Mount accumulator panel | |||
** Mount radio on lift posts | |||
** Wire CAN Chain with new plan | |||
** Mount Gripper motor controllers | |||
** Figure out Flag sensors | |||
** Talk to gripper about beam breaks | |||
** Build in a quick disconnect for the pneumatics | |||
** Regulate IGUS chain length | |||
** Put the accumulators on the panel and make them work | |||
** Put in the pneumatics regulators | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
=== 2/14/2023 === | |||
* Accomplished | |||
** IO Map is up to date (probably) | |||
** Compressor has been mounted | |||
** IGUS chain is all set | |||
** Accumulator panel is being implements, worked out issues with the 3d printed triangle supports, discussed potential support from the superstructure or lift bridge | |||
** Lift has reimplemented the posts which makes life easier | |||
* To-Do | |||
**Prepare the rest of the pneumatics | |||
*** mount manifold and pcm | |||
** Test the compressor for air retention | |||
** Mount accumulator panel | |||
** Mount radio on lift posts | |||
** Wire CAN Chain with new plan ? | |||
** Mount Gripper motor controllers | |||
** Figure out Flag sensors | |||
** Talk to gripper about beam breaks | |||
** Build in a quick disconnect for the pneumatics | |||
** Put the accumulators on the panel and make them work | |||
** Put in the pneumatics regulators | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
** Update IO Map | |||
*** | |||
=== 2/15/2023 - The Robot Turned On! === | |||
* Accomplished | |||
** Test the compressor for air retention | |||
** Mount accumulator panel | |||
** Can Chain is wired in without the Gripper motor controllers | |||
** PCM, Manifold, Accumulators, Compressor, and Regulators are connected | |||
** Prepare the rest of the pneumatics | |||
*** mount manifold and pcm | |||
* To-Do | |||
** Mount accumulator panel with new working parts + add the horizontal attachment(?) | |||
** Fully explore another contact point for accumulator panel | |||
** Mount radio on lift posts | |||
** Wire CAN Chain with new plan | |||
** Mount Gripper motor controllers | |||
** Figure out Flag sensors | |||
** Talk to gripper about beam breaks | |||
** Build in a quick disconnect for the pneumatics | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
** Update IO Map -> PCM with Parking Break | |||
** Wire the power for PCM | |||
** Manage the RIO and VRM power connections | |||
** Double check all breakers | |||
=== 2/16/2023 === | |||
* Accomplished | |||
** Wire the power for PCM | |||
** Manage the RIO and VRM power connections | |||
** Fixed motor controller | |||
* To-Do | |||
** Mount accumulator panel with new working parts + add the horizontal attachment(?) | |||
** Fully explore another contact point for accumulator panel | |||
** Mount radio on lift posts | |||
** Wire CAN Chain with new plan | |||
** Mount Gripper motor controllers | |||
** Figure out Flag sensors | |||
** Talk to gripper about beam breaks | |||
** Build in a quick disconnect for the pneumatics | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
** Update IO Map -> PCM with Parking Break | |||
** Double check all breakers | |||
=== 2/18/2023 === | |||
* Accomplished | |||
** Checked routing and breakers a bit | |||
** Accumulator panel is now planned to be mounted on the ribs\ | |||
** Build in a quick disconnect for the pneumatics | |||
** Started pressure release valve placement | |||
** Tested the pneumatic system | |||
** Wired and routed everything on gripper, with quick disconnect for beam break | |||
** Mount radio on lift posts | |||
** Figure out Flag sensors, are on lift right now with the lovely resistors | |||
** Double check all breakers | |||
** Finalize pressure release valve placement, on top of bridge kinda | |||
** Discussed potential plans for LEDs | |||
** I actually updated the IOmap | |||
** Trying out magnetic burglar alarm for lift hard stop/home sensor | |||
* To-Do | |||
** Fully explore another contact point for accumulator panel | |||
** Wire CAN Chain with new plan | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
** Route IGUS chain | |||
** Update IO Map | |||
=== 2/19/2023 === | |||
* Accomplished | |||
** Gripper is fully prepared to connect with igus chain things | |||
** Pneumatic igus chain (x2) is on lift and partially routed | |||
** Improved accessibility to breaker | |||
* To-Do | |||
** Fully explore another contact point for accumulator panel | |||
** Wire CAN Chain with new plan | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
** Route IGUS chain | |||
** Update IO Map | |||
=== 2/20/2023 === | |||
* Accomplished | |||
** All wires/pneumatics are through the 3 igus chains | |||
** Majority of quick disconnects have been routed | |||
*** Wire CAN Chain with new plan | |||
* To-Do | |||
** Fully explore another contact point for accumulator panel | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
** Update IO Map | |||
** Figure out issues with igus chain | |||
=== 2/21/2023 === | |||
* Accomplished | |||
** Figure out issues with igus chain | |||
** Fixed intake sensor kinda | |||
* To-Do | |||
** Fully explore another contact point for accumulator panel | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
** Update IO Map | |||
=== 2/22/2023 === | |||
* Accomplished | |||
** Fixed pneumatic leak | |||
** Worked with 3d printed IMU holder | |||
** Put signal light/camera mount things on robot (not final) | |||
* To-Do | |||
** Fully explore another contact point for accumulator panel | |||
** Figure out what is going on with the LEDs (sponsor panels?) | |||
** Update IO Map | |||
=== 2/23/2023 === | |||
* Accomplished | |||
* To-Do | |||
=== 2/24/2023 === | |||
* Accomplished | |||
* To-Do | |||
=== 2/25/2023 === | |||
* Accomplished | |||
* To-Do | |||
=== 2/26/2023 === | |||
* Accomplished | |||
* To-Do | |||
=Archives= | =Archives= |
Latest revision as of 18:21, 22 February 2023
General Electrical Info:
Terminating Wires:
For CAN: Green is Left/Ground, Yellow is Right
For Power: Black is Left/Ground, Red is Right
Breakers(All should be in the MPT):
With PDH:
20amp SnapAction
30amp SnapAction
40amp REV
Pneumatics:
Green: Changing Pressures
Yellow: High Pressure
Blue: Low Pressure
White: Extend
Black: Retract
Electrical Wiring Diagrams:
Optek Flag Sensor Wiring Diagram:
Q10 Series Banner Sensor Wiring Diagram:
Wiring Diagram with Rev PDH
Wire Routing
- Lift
- Using the 1in IGUS chain x2 (1 for pneumatics and 1 for electrical) for extension
- Gripper
- Drive
Potential CAN Chain (1/21/23)
Current CAN Chain Plan (2/11/2023)
Daily Status
1/21/2023
- Accomplished
- Added power poles to shopping list
- Added CANcoders to shopping list
- Inspected Homer's swerve modules, found 2 suspect
- Inventoried IGUS chain
- Found 3 sets of end pieces
- Pulled 2 44in lengths for use on 2023 robot (on black shelves)
- Decided to use IGUS chain for extension
- Rewired CANcoder B (on black shelves)
- Discussed with Nick L and Berkeley about battery placement
- To-Do
- Finish rewiring CANcoder A (on black shelves)
- Terminate and Label Motor Side and CAN Connection of Swerve Drive Spark Max (45A)
- Terminate and Label Motor Side and CAN Connection of Swerve Rotation Spark Max (30A)
- Continue to work with Lift/Gripper on sensor placement (ensure some level of adjustability)
- Rough out locations of Speed Controllers
- Update IO Map
1/22/2023
- Accomplished
- Wired, labeled, and CAN IDed the 8 drive motor controllers
- Figuring out Battery Things
- Talked with Acquire about beam break placement
- Electrical Component placement in CAD started
- Found an Ethernet Switch (not the right one)
- To-Do
- Update IO Map
- Figure out sensors with Lift
- Quality check motor controllers
- Finish rewiring CANcoder A (on black shelves)
- Order a more industrial Ethernet Switch
1/24/2023
- Accomplished
- Quality checked drive motor controllers
- Finished rewiring CANcoder A (on black shelves) (questionable condition).
- To-Do
- Update IO Map
- Figure out sensors with Lift
- Test CANcoder A (on black shelves) to confirm integrity of the components
- Order a more industrial Ethernet Switch
1/25/2023
- MEETING CANCELLED
1/26/2023
- Accomplished
- To-Do
1/28/2023
- Accomplished
- Order a more industrial Ethernet Switch
- Put away some stuff
- Post testing, install CAN Encoders to the swerve modules
- Fixed batteries
- Test CANcoder A (on black shelves) to confirm integrity of the components
- Both Encoders A & B work with the modules
- Figure out sensors with Lift
- Flag sensors at either side of the base telescope
- Flag sensors at either side of the base telescope
- To-Do
- Update IO Map
- Finalize motor controllers for the not drive base mechanisms and prep them
- Give a PSA about battery usage (Planning to do it Dinner on Tuesday)
1/29/2023
- Accomplished
- Talked about alternate component places
- Talked about alternate component places
- To-Do
- Update IO Map
- Finalize motor controllers for the not drive base mechanisms and prep them
- Check up with Gripper about Beam Break mounting
1/31/2023
- Accomplished
- 3d printed Beam Break mount for Gripper
- Continued Component Placement
- To-Do
- Update IO Map
- Finalize motor controllers for the not drive base mechanisms and prep them
2/1/2023
- Accomplished
- Continued component placement
- Need more info to finalize accumulators
- Need more info to finalize accumulators
- Continued component placement
- To-Do
- Update IO Map
- Finalize motor controllers for the not drive base mechanisms and prep them
2/2/2023
- Accomplished
- To-Do
2/4/2023
- Accomplished
- Accumulators are horizontal with 3d printed triangle brackets being made
- Electrical placements are mostly finalized
- Finalize motor controllers for the not drive base mechanisms and prep them
- Worked with DB on Protective/Sponsor Pannels
- To-Do
- Update IO Map
- Terminate the batteries when the terminator things come in
- Id non drive base motor controllers
2/5/2023
- Accomplished
- Id non drive base motor controllers
- Prepared the compressor
- Terminated 5 of the batteries that we had the lugs for
- To-Do
- Update IO Map
- Terminate the batteries when the terminator things come in
- Figure out how to mount compressor
- Prepare the rest of the pneumatics
2/7/2023
- Accomplished
- Disassembled 3 port manifold and PCM from 2022
- Worked on potential mountings for components
- To-Do
- Update IO Map
- Terminate the batteries when the terminator things come in
- Figure out how to mount compressor
- Prepare the rest of the pneumatics
2/8/2023
- Accomplished
- Terminated gripper motors
- Beam Break on gripper is mounted
- Working on figuring out electrical paneling
- To-Do
- Update IO Map
- Terminate the batteries when the terminator things come in
- Figure out how to mount compressor
- Prepare the rest of the pneumatics
- Map out placement for components
2/9/2023
- Accomplished
- To-Do
2/11/2023
- Accomplished
- Mounted a lot of electrical components
- Planned out component placement
- Updating physical copy of the robot IO map
- Mounting compressor to the belly pan
- Planned Manifold (6, I believe we are doing 4 doubles with 2 blocks)
- Put together manifold solenoids and blocks
- Wiring Drive Base motors to PDH
- Figured out motor controller placement for Acquisition
- Figured out IGUS situation
- Situated the Ball Screw motor controllers
- Terminated some Batteries
- Mounted the breaker
- To-Do
- Update IO Map
- Finish terminating the batteries
- Mount compressor
- Prepare the rest of the pneumatics
- mount manifold and pcm
- Test the compressor for air retention
- Mount accumulator panel
- Mount radio on lift posts
- Wire CAN Chain with new plan
- Plug CAN encoders into vrm
- Mount Gripper motor controllers
- Figure out Flag sensors
- Talk to gripper about beam breaks
- Mount ethernet switch and Pi
- Build in a quick disconnect for the pneumatics
- Regulate IGUS chain length
- Put the accumulators on the panel and make them work
- Put in the pneumatics regulators
- Figure out what is going on with the LEDs (sponsor panels?)
2/12/2023
- Accomplished
- 2023 Competition batteries are done
- Plug CAN encoders into vrm
- Gripper had the addition of a second piston for the wrist- we're going to have to do some silly things
- Finished drive base plus ball screw can chain
- Ethernet Switch, Pi, and VRM are on robot
- Lift had to remove posts from robot so the motor controller at the base is offline at the moment
- To-Do
- Update IO Map
- Mount compressor
- Prepare the rest of the pneumatics
- mount manifold and pcm
- Test the compressor for air retention
- Mount accumulator panel
- Mount radio on lift posts
- Wire CAN Chain with new plan
- Mount Gripper motor controllers
- Figure out Flag sensors
- Talk to gripper about beam breaks
- Build in a quick disconnect for the pneumatics
- Regulate IGUS chain length
- Put the accumulators on the panel and make them work
- Put in the pneumatics regulators
- Figure out what is going on with the LEDs (sponsor panels?)
2/14/2023
- Accomplished
- IO Map is up to date (probably)
- Compressor has been mounted
- IGUS chain is all set
- Accumulator panel is being implements, worked out issues with the 3d printed triangle supports, discussed potential support from the superstructure or lift bridge
- Lift has reimplemented the posts which makes life easier
- To-Do
- Prepare the rest of the pneumatics
- mount manifold and pcm
- Test the compressor for air retention
- Mount accumulator panel
- Mount radio on lift posts
- Wire CAN Chain with new plan ?
- Mount Gripper motor controllers
- Figure out Flag sensors
- Talk to gripper about beam breaks
- Build in a quick disconnect for the pneumatics
- Put the accumulators on the panel and make them work
- Put in the pneumatics regulators
- Figure out what is going on with the LEDs (sponsor panels?)
- Update IO Map
- Prepare the rest of the pneumatics
2/15/2023 - The Robot Turned On!
- Accomplished
- Test the compressor for air retention
- Mount accumulator panel
- Can Chain is wired in without the Gripper motor controllers
- PCM, Manifold, Accumulators, Compressor, and Regulators are connected
- Prepare the rest of the pneumatics
- mount manifold and pcm
- To-Do
- Mount accumulator panel with new working parts + add the horizontal attachment(?)
- Fully explore another contact point for accumulator panel
- Mount radio on lift posts
- Wire CAN Chain with new plan
- Mount Gripper motor controllers
- Figure out Flag sensors
- Talk to gripper about beam breaks
- Build in a quick disconnect for the pneumatics
- Figure out what is going on with the LEDs (sponsor panels?)
- Update IO Map -> PCM with Parking Break
- Wire the power for PCM
- Manage the RIO and VRM power connections
- Double check all breakers
2/16/2023
- Accomplished
- Wire the power for PCM
- Manage the RIO and VRM power connections
- Fixed motor controller
- To-Do
- Mount accumulator panel with new working parts + add the horizontal attachment(?)
- Fully explore another contact point for accumulator panel
- Mount radio on lift posts
- Wire CAN Chain with new plan
- Mount Gripper motor controllers
- Figure out Flag sensors
- Talk to gripper about beam breaks
- Build in a quick disconnect for the pneumatics
- Figure out what is going on with the LEDs (sponsor panels?)
- Update IO Map -> PCM with Parking Break
- Double check all breakers
2/18/2023
- Accomplished
- Checked routing and breakers a bit
- Accumulator panel is now planned to be mounted on the ribs\
- Build in a quick disconnect for the pneumatics
- Started pressure release valve placement
- Tested the pneumatic system
- Wired and routed everything on gripper, with quick disconnect for beam break
- Mount radio on lift posts
- Figure out Flag sensors, are on lift right now with the lovely resistors
- Double check all breakers
- Finalize pressure release valve placement, on top of bridge kinda
- Discussed potential plans for LEDs
- I actually updated the IOmap
- Trying out magnetic burglar alarm for lift hard stop/home sensor
- To-Do
- Fully explore another contact point for accumulator panel
- Wire CAN Chain with new plan
- Figure out what is going on with the LEDs (sponsor panels?)
- Route IGUS chain
- Update IO Map
2/19/2023
- Accomplished
- Gripper is fully prepared to connect with igus chain things
- Pneumatic igus chain (x2) is on lift and partially routed
- Improved accessibility to breaker
- To-Do
- Fully explore another contact point for accumulator panel
- Wire CAN Chain with new plan
- Figure out what is going on with the LEDs (sponsor panels?)
- Route IGUS chain
- Update IO Map
2/20/2023
- Accomplished
- All wires/pneumatics are through the 3 igus chains
- Majority of quick disconnects have been routed
- Wire CAN Chain with new plan
- To-Do
- Fully explore another contact point for accumulator panel
- Figure out what is going on with the LEDs (sponsor panels?)
- Update IO Map
- Figure out issues with igus chain
2/21/2023
- Accomplished
- Figure out issues with igus chain
- Fixed intake sensor kinda
- To-Do
- Fully explore another contact point for accumulator panel
- Figure out what is going on with the LEDs (sponsor panels?)
- Update IO Map
2/22/2023
- Accomplished
- Fixed pneumatic leak
- Worked with 3d printed IMU holder
- Put signal light/camera mount things on robot (not final)
- To-Do
- Fully explore another contact point for accumulator panel
- Figure out what is going on with the LEDs (sponsor panels?)
- Update IO Map
2/23/2023
- Accomplished
- To-Do
2/24/2023
- Accomplished
- To-Do
2/25/2023
- Accomplished
- To-Do
2/26/2023
- Accomplished
- To-Do