2011:Field 2/9/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: Members present: <br>Members Attending Next Meeting: -------------------------------------------------------------------------------- Tasks Completed: Task 1 - Task 2 - ---...)
 
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Members present:  
Members present: Shayna and Manuel worked on chairman's and the robot&nbsp;
 
Mentors present: Amy, Lloyd


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  


<br>


<br>


<br>


 
<br>--------------------------------------------------------------------------------  
--------------------------------------------------------------------------------


Tasks Completed:  
Tasks Completed:  


Task 1 -  
Task 1 - Cut shelves for shelving unit <br>Task 2 - Built second shelving unit <br>


Task 2 -
<br>


<br>


 
----
--------------------------------------------------------------------------------  


Tasks In Progress:  
Tasks In Progress:  
Line 29: Line 33:
Tasks to Complete:  
Tasks to Complete:  


Task 1 -  
Task&nbsp;1 - Place Refelective Tape on poles
 
Task&nbsp;2 - Drill holes for rail alignment
 
Task&nbsp;3 - Create plates for rail rigidity
 
Task&nbsp;4 - Determine what to do for extra 2" pole length
 
Task&nbsp;5 - Wrap post bottoms with solid material
 
Task&nbsp;6 - Mount post toppers
 
Task&nbsp;7 - Determine/Construct method to keep lane dividers in place
 
Task&nbsp;8 - Mounting system on player stations for power/connectivity
 
Task&nbsp;9 - Drill holes in each player station for cords
 
Task 10 - Drill 1 hole in each piece of Lexan for securing


Task 2 -  
Task 11 - Sand down inside of feeder plates


Task 12 - Make sure we have enough Velcro


<br>


<br>


<br>


--------------------------------------------------------------------------------  
<br>--------------------------------------------------------------------------------  


Materials Needed:  
Materials Needed:  


<br>Item 1 -  
<br>Item 1 - 4x4s
 
Item 2 - Hardware for rails


Item 2 -
<br>


--------------------------------------------------------------------------------  
----


Images &amp; Additional Updates:  
<br>Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Latest revision as of 06:39, 10 February 2011

Members present: Shayna and Manuel worked on chairman's and the robot 

Mentors present: Amy, Lloyd


Members Attending Next Meeting:





--------------------------------------------------------------------------------

Tasks Completed:

Task 1 - Cut shelves for shelving unit
Task 2 - Built second shelving unit




Tasks In Progress:

Task 1 -

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Place Refelective Tape on poles

Task 2 - Drill holes for rail alignment

Task 3 - Create plates for rail rigidity

Task 4 - Determine what to do for extra 2" pole length

Task 5 - Wrap post bottoms with solid material

Task 6 - Mount post toppers

Task 7 - Determine/Construct method to keep lane dividers in place

Task 8 - Mounting system on player stations for power/connectivity

Task 9 - Drill holes in each player station for cords

Task 10 - Drill 1 hole in each piece of Lexan for securing

Task 11 - Sand down inside of feeder plates

Task 12 - Make sure we have enough Velcro





--------------------------------------------------------------------------------

Materials Needed:


Item 1 - 4x4s

Item 2 - Hardware for rails




Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)