Members present: | Members present: Shayna and Manuel worked on chairman's and the robot | ||
Mentors present: Amy, Lloyd | |||
<br>Members Attending Next Meeting: | <br>Members Attending Next Meeting: | ||
<br> | |||
<br> | |||
<br> | |||
<br>-------------------------------------------------------------------------------- | |||
-------------------------------------------------------------------------------- | |||
Tasks Completed: | Tasks Completed: | ||
Task 1 - | Task 1 - Cut shelves for shelving unit <br>Task 2 - Built second shelving unit <br> | ||
<br> | |||
<br> | |||
---- | |||
Tasks In Progress: | Tasks In Progress: | ||
Line 29: | Line 33: | ||
Tasks to Complete: | Tasks to Complete: | ||
Task 1 - | Task 1 - Place Refelective Tape on poles | ||
Task 2 - Drill holes for rail alignment | |||
Task 3 - Create plates for rail rigidity | |||
Task 4 - Determine what to do for extra 2" pole length | |||
Task 5 - Wrap post bottoms with solid material | |||
Task 6 - Mount post toppers | |||
Task 7 - Determine/Construct method to keep lane dividers in place | |||
Task 8 - Mounting system on player stations for power/connectivity | |||
Task 9 - Drill holes in each player station for cords | |||
Task 10 - Drill 1 hole in each piece of Lexan for securing | |||
Task | Task 11 - Sand down inside of feeder plates | ||
Task 12 - Make sure we have enough Velcro | |||
<br> | |||
<br> | |||
<br> | |||
-------------------------------------------------------------------------------- | <br>-------------------------------------------------------------------------------- | ||
Materials Needed: | Materials Needed: | ||
<br>Item 1 - | <br>Item 1 - 4x4s | ||
Item 2 - Hardware for rails | |||
<br> | |||
---- | |||
Images & Additional Updates: | <br>Images & Additional Updates: | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) |
Latest revision as of 06:39, 10 February 2011
Members present: Shayna and Manuel worked on chairman's and the robot
Mentors present: Amy, Lloyd
Members Attending Next Meeting:
--------------------------------------------------------------------------------
Tasks Completed:
Task 1 - Cut shelves for shelving unit
Task 2 - Built second shelving unit
Tasks In Progress:
Task 1 -
Task 2 -
--------------------------------------------------------------------------------
Tasks to Complete:
Task 1 - Place Refelective Tape on poles
Task 2 - Drill holes for rail alignment
Task 3 - Create plates for rail rigidity
Task 4 - Determine what to do for extra 2" pole length
Task 5 - Wrap post bottoms with solid material
Task 6 - Mount post toppers
Task 7 - Determine/Construct method to keep lane dividers in place
Task 8 - Mounting system on player stations for power/connectivity
Task 9 - Drill holes in each player station for cords
Task 10 - Drill 1 hole in each piece of Lexan for securing
Task 11 - Sand down inside of feeder plates
Task 12 - Make sure we have enough Velcro
--------------------------------------------------------------------------------
Materials Needed:
Item 1 - 4x4s
Item 2 - Hardware for rails
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)