2009:Electricla Main - 1.20.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: 01.20.2009 Start time: 6:30<br> End time: 9<br> Members present: Rika, Michael, Crystal, Sean, Collin, Apples, Oranges<br> Tasks Completed: * task<br> * task <br>Tasks In Progress: ...)
 
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
01.20.2009
01.20.2009  


Start time: 6:30<br>
Start time: 6:30<br>  


End time: 9<br>
End time: 9<br>  


Members present: Rika, Michael, Crystal, Sean, Collin, Apples, Oranges<br>
Members present: Rika, Michael, Crystal, Sean, Collin, Apples, Oranges<br>  


Tasks Completed:
Tasks Completed:  


* task<br> * task
*Gathering placement information [Battery is/should be official] In a settlement of weight balance. &gt;&gt;;; x3
*Created a basic idea of what the official electrical board mounting should look like
*Weighed Crio components, see below the measurements and weightings.


<br>Tasks In Progress:
<br>Tasks In Progress:  


* task<br> * task
*Determination of Crio placement officially
*Collaberation with Programming team on sensor status due to the control changes. [As far as buttons go and whatnot]


<br>Tasks to Complete:
<br>Tasks to Complete:  


* task<br> * task
*Official placement of electronics in a source of good balance.
*Switch transmission CIM Motors to 10 gauge wires.
*Solidify wiring system and get "floppier" wires for easy manuverablilty annnd Crystal's blood pressure is rising x3
*Batter DIAPER!!
*Determine mounting strategies as far as bolting/velcroing schtoof goes.


<br>[[Image:It Doesn't Die Chassis Mount]]<br>
<br>[[Image:It Doesn't Die Chassis Mount]][[Image:It_Doesn't_Die_Chassis_Mount.jpg]]<br>  
 
-Hopefully the mount for the electronics on the Chassis.. more to come. Courtesy of Colin. :D
 
'''**NOT FINAL!!!** BUT HOPEFULLY WILL BE. RAWR. &gt;:3'''
 
'''Notes:'''
 
-Crio weight with 3 modules is 3.12 lbs.
 
-Distance between transmissions horizontally 11"
 
-Distance between transmissions vertically ~8"

Latest revision as of 14:38, 14 November 2010

01.20.2009

Start time: 6:30

End time: 9

Members present: Rika, Michael, Crystal, Sean, Collin, Apples, Oranges

Tasks Completed:

  • Gathering placement information [Battery is/should be official] In a settlement of weight balance. >>;; x3
  • Created a basic idea of what the official electrical board mounting should look like
  • Weighed Crio components, see below the measurements and weightings.


Tasks In Progress:

  • Determination of Crio placement officially
  • Collaberation with Programming team on sensor status due to the control changes. [As far as buttons go and whatnot]


Tasks to Complete:

  • Official placement of electronics in a source of good balance.
  • Switch transmission CIM Motors to 10 gauge wires.
  • Solidify wiring system and get "floppier" wires for easy manuverablilty annnd Crystal's blood pressure is rising x3
  • Batter DIAPER!!
  • Determine mounting strategies as far as bolting/velcroing schtoof goes.


File:It Doesn't Die Chassis MountIt Doesn't Die Chassis Mount.jpg

-Hopefully the mount for the electronics on the Chassis.. more to come. Courtesy of Colin. :D

**NOT FINAL!!!** BUT HOPEFULLY WILL BE. RAWR. >:3

Notes:

-Crio weight with 3 modules is 3.12 lbs.

-Distance between transmissions horizontally 11"

-Distance between transmissions vertically ~8"