2010:Integration Status: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(added issue updates from integration meeting 1/25)
 
(47 intermediate revisions by 8 users not shown)
Line 3: Line 3:
Subteams, please use the attached template to update the Bill of Materials!!  Please ONLY use your own sheet (see tabs on the bottom), and upload it to the Wiki under the name BOM_(subteam).xls.  For Example Drivetrain would be BOM_Drivetrain.xls.  You can then update that file over and over again, and the wiki will save all of the revisions, so there is NO NEED to put a Date on it.  
Subteams, please use the attached template to update the Bill of Materials!!  Please ONLY use your own sheet (see tabs on the bottom), and upload it to the Wiki under the name BOM_(subteam).xls.  For Example Drivetrain would be BOM_Drivetrain.xls.  You can then update that file over and over again, and the wiki will save all of the revisions, so there is NO NEED to put a Date on it.  


[[Media:BOM_2009.xls]]  
''FIRST has realeased their template for 2010. Rules REQUIRE that this template be used!! It is referenced on [http://www.usfirst.org/roboticsprograms/frc/content.aspx?id=452 the FIRST manual page]''


[[Media:BOM_ElectricalMain.xls]]  
'''Here is a Template set up for 1511! ''' Please use this one: [[Image:BOM Template 2010.xls|FIRST BOM 2010]]  


[[Media:BOM_Mechanical.xls]]  
Fill out YOUR&nbsp;OWN&nbsp;TAB, and upload your version here.&nbsp; We can merge it at the end of build season.<br>'''Robot Final BOM'''<br>[http://penfieldrobotics.com/wiki/images/f/f4/TEAM_1511_BOM_03-01-2010_Rev2.xls <span style="text-decoration: underline;"><u>Robot Final BOM 2010</u></span>]<br><br>'''Drivetrain''' <br> [http://penfieldrobotics.com/wiki/images/b/bd/BOM_03-01-2010.xls <span style="text-decoration: underline;"><u>Drivetrain BOM 2010</u></span>] <br>'''Mechanical Lift'''<br>[http://penfieldrobotics.com/wiki/images/a/a6/Hanger-Move-BOM_03-01-2010.xls <span style="text-decoration: underline;"><u>Mechanical Hanger BOM 2010</u></span>]<br>'''Mechanical Kicker'''<br> [http://penfieldrobotics.com/wiki/images/d/d3/BOM_Mechanical_2010_3-1-10.xls <span style="text-decoration: underline;"><u>Mechanical Kicker BOM 2010</u></span>] <br> '''Electrical''' <br> [http://penfieldrobotics.com/wiki/images/a/ae/BOM_2010.xls <span style="text-decoration: underline;"><u>Electrical BOM 2010</u></span>] <br>
 
[[Media:BOM_Drivetrain.xls]]
 
[[Media:BOM_ElectricalControls.xls]]


== Integration&nbsp;Status<br>  ==
== Integration&nbsp;Status<br>  ==
Line 17: Line 13:
Subteams, please used the attached document to format your integration notes for the meeting. They can be handwritten or typed, it is just a reminder for what info you need to provide.  
Subteams, please used the attached document to format your integration notes for the meeting. They can be handwritten or typed, it is just a reminder for what info you need to provide.  


[[Media:IntegrationSheet.doc]]  
[[Media:IntegrationSheet.doc]] <br> ''''Note: being updated for 2010!''''  
 
Also please make sure to update the [[Robot Design Details|Robot Design]] page as you add details to your designs!!
 
Integration Meetings are Tuesday &amp;&nbsp;Thursday at 5:30PM, and Saturday at 1:00PM in F2 Back Room.
 
=== '''Integration Meeting Notes''' ===
 
[[Integration 1.8.2009|Thursday 1/8/2009]]
 
[[Integration 1.10.2009|Saturday 1/10/2009]]
 
[[Integration 1.13.2009|Tuesday 1/13/2009]]
 
[[Integration 1.15.2009|Thursday 1/15/2009]]
 
[[Integration 1.17.2009|Saturday 1/17/2009]]
 
[[Integration 1.20.2009|Tuesday 1/20/2009]]
 
[[Integration 1.22.2009|Thursday 1/22/2009]]
 
[[Integration 1.25.2009|Sunday 1/25/2009]]
 
Tuesday 1/27/2009
 
Thursday 1/29/2009
 
Saturday 1/31/2009


Tuesday 2/2/2009  
Also please make sure to update the [[2009:Robot Design Details|Robot Design]] page as you add details to your designs!!


Thursday 2/4/2009
Integration Meetings are ''times &amp; location tbd''.


Saturday 2/6/2009
== '''Integration Meeting Notes'''  ==


Tuesday 2/9/2009
[[2010:Integration 1.16.2010|Saturday 1/16/2010]] <br>[[2010:Integration 1.19|Tuesday 1/19/2010]] <br>[[2010:Integration 1.21|Thursday 1/21/2010]] <br>[[2010:Integration 1.23|Saturday 1/23/2010]]&nbsp;<br>[[2010:Integration 1.26.2010|Tuesday 1/26/2010]] <br>[[2010:Integration 1.28.2010|Thursday 1/28/2010]] <br>[[2010:Integration 1.30.2010|Saturday 1/30/2010]] <br>[[2010:Integration 2.2.2010|Tuesday 2/2/2010]] <br>[[2010:Integration 2.4.2010|Thursday 2/4/2010]] <br>[[2010:Integration 2.6.2010|Saturday 2/6/2010]] <br>[[2010:Integration 2.9.2010|Tuesday 2/9/2010]] <br>[[2010:Integration 2.11.2010|Thursday 2/11/2010]] <br>[[2010:Integration 2.13.2010|Saturday 2/13/2010]] <br>[[2010:Integration 2.16.2010|Tuesday 2/16/2010]] <br>[[2010:Integration 2.18.2010|Thursday 2/18/2010]]


Thursday 2/11/2009
Parts Needed To Buy<br>  
 
=== Parts Needed To Buy<br> ===


Please use the [[ShoppingList|Shopping List ]]Page!  
Please use the [[ShoppingList|Shopping List ]]Page!  
Line 69: Line 35:
<br>  
<br>  


=== Subteam Issue Tracking&nbsp; ===
=== Subteam Issue Tracking  ===


{| width="800" cellspacing="1" cellpadding="0" border="1" align="left"
{| cellspacing="1" cellpadding="0" border="1" width="800"
|-
|-
| '''Date'''  
| '''Date'''  
Line 80: Line 46:
| '''Complete'''
| '''Complete'''
|-
|-
| 1/8
| <br>
| Need dimensions of surfaces where control system/electronics can be mounted
| <br>
| Electrical Main
| <br>
| Mech1, Mech 2, Drive
| <br>
| 1/15
| <br>
| NO
| <br>
|-
|-
| 1/13
| <br>
| Need Control Box I/O’s
| <br>
| Programming
| <br>
| Elec Controls
| <br>
| 1/21
| <br>
| NO
| <br>
|-
| 1/15
| Help Port ProE into Inventor
| Drivetrain
| Mechanical
| 1/18
| NO
|-
| 1/17
| Need to Finalize Weight Balance
| Mechanical
| Elec, Mechanical, Drive
| 1/31
| NO
|-
| 1/20
| Mechanical Mounting Design for Mouse
| Electrical
| Drivetrain
| 1/28
| NO
|-
| 1/20
| Update Bill of Materials
| Leadership
| ALL SUBTEAMS
| 1/31
| NO
|-
| 1/22
| Camera Mount Design &amp; location
| Programming
| Mechanical
| 1/31
| NO
|-
| 1/25
| Need Electrical Parts to Port in
| Mechanical
| Electrical
| 1/27
| NO
|-
| 1/25
| Test Mechanical Mouse
| Drivetrain
| Programming
| 1/27
| NO
|-
| 1/25
| Investigate Clicking Noise
| Programming
| Drivetrain
| 1/27
| NO
|-
|
|
|
|
|
|
|-
|
|  
|  
|  
|  
|  
|}
|}


<br><br><br><br><br><br><br><br><br><br><br><br><br><br><br>
<br><br>  
 
<br>  


=== '''Completed Issues'''  ===
=== '''Completed Issues'''  ===


{| width="800" cellspacing="1" cellpadding="0" border="1" align="left"
{| cellspacing="1" cellpadding="0" border="1" width="800"
|-
|-
| '''Date'''  
| '''Date'''  
Line 180: Line 74:
| '''Complete'''
| '''Complete'''
|-
|-
| 1/13
| <br>
| Need to know what Sensors are needed
| <br>
| Electrical, Programming
| <br>
| Programming, Mechanical
| <br>  
| 1/18
| <br>  
| YES
| <br>
|-
| 1/15
| Determine if Encoder Wheel Needed
| Electrical/Mechanical
| Programming
| 1/17
| YES
|-
| 1/8
| Available space and dimensions from Inventor mockup<br>  
| Mechanical 1<br>  
| Mechanical 2<br>  
| 1/18
| YES
|-
| 1/20
| Fix Rubbing Wheel on Mock Drive
| Programming
| Drivetrain
| 1/21
| NOT NEEDED 1/22
|-
| 1/20
| Add Fake Weight to the Chassis
| Programming
| Mechanical
| 1/21
| YES 1/24
|-
| 1/13
| How are trapdoors defined?
| Programming
| Mechanical
| 1/18
| YES - 1/25
|-
| 1/22
| Where do Sensors Go?
| Mechanical
| Electrical
| 1/24
| YES - 1/25
|-
| 1/20
| Need to know how much frame detail is needed
| Mechanical
| Amy/Josh
| 1/22
| YES - 1/25
|-
|
|
|
|
|
|
|}
|}
== Archives  ==
*[[2009:Integration Status|2009 Integration Status Page]]

Latest revision as of 15:47, 14 November 2010

Bill of Materials

Subteams, please use the attached template to update the Bill of Materials!!  Please ONLY use your own sheet (see tabs on the bottom), and upload it to the Wiki under the name BOM_(subteam).xls.  For Example Drivetrain would be BOM_Drivetrain.xls.  You can then update that file over and over again, and the wiki will save all of the revisions, so there is NO NEED to put a Date on it.

FIRST has realeased their template for 2010. Rules REQUIRE that this template be used!! It is referenced on the FIRST manual page

Here is a Template set up for 1511!  Please use this one: File:BOM Template 2010.xls

Fill out YOUR OWN TAB, and upload your version here.  We can merge it at the end of build season.
Robot Final BOM
Robot Final BOM 2010

Drivetrain
Drivetrain BOM 2010
Mechanical Lift
Mechanical Hanger BOM 2010
Mechanical Kicker
Mechanical Kicker BOM 2010
Electrical
Electrical BOM 2010

Integration Status

Subteams, please used the attached document to format your integration notes for the meeting. They can be handwritten or typed, it is just a reminder for what info you need to provide.

Media:IntegrationSheet.doc
'Note: being updated for 2010!'

Also please make sure to update the Robot Design page as you add details to your designs!!

Integration Meetings are times & location tbd.

Integration Meeting Notes

Saturday 1/16/2010
Tuesday 1/19/2010
Thursday 1/21/2010
Saturday 1/23/2010 
Tuesday 1/26/2010
Thursday 1/28/2010
Saturday 1/30/2010
Tuesday 2/2/2010
Thursday 2/4/2010
Saturday 2/6/2010
Tuesday 2/9/2010
Thursday 2/11/2010
Saturday 2/13/2010
Tuesday 2/16/2010
Thursday 2/18/2010

Parts Needed To Buy

Please use the Shopping List Page!


Parts Needing To Be Made

Please use the Fabrication Page!


Subteam Issue Tracking

Date Issue Description Needed By (subteam) Assigned To (subteam) Date Needed Complete














Completed Issues

Date Issue Description Needed By (subteam) Assigned To (subteam) Date Needed Complete






Archives