2023:Electrical Main: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary Tag: visualeditor |
Tag: visualeditor |
||
Line 57: | Line 57: | ||
*To-Do | *To-Do | ||
**Finish rewiring CANcoder A (on black shelves) | **Finish rewiring CANcoder A (on black shelves) | ||
**Select gripper sensors | |||
**Continue to work with Lift/Gripper on sensor placement (ensure some level of adjustibility) | |||
**Rough out locations of Speed Controllers | |||
**Update IO Map | |||
=== 1/22/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 1/24/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 1/25/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 1/26/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 1/28/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 1/29/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 1/31/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/1/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/2/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/4/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/5/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/7/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/8/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/9/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/11/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=== 2/12/2023 === | |||
* Accomplished | |||
** | |||
* To-Do | |||
** | |||
=Archives= | =Archives= |
Revision as of 11:49, 22 January 2023
General Electrical Info:
Terminating Wires:
For CAN: Green is Left/Ground, Yellow is Right
For Power: Black is Left/Ground, Red is Right
Breakers(All should be in the MPT):
With PDH:
20amp SnapAction
30amp SnapAction
40amp REV
Electrical Wiring Diagrams:
Optek Flag Sensor Wiring Diagram:
Q10 Series Banner Sensor Wiring Diagram:
Wiring Diagram with Rev PDH
Wire Routing
- Lift
- Using the 1in IGUS chain x2 (1 for pneumatics and 1 for electrical) for extension
- Gripper
- Drive
Potential CAN Chain (1/21/23)
Daily Status
1/21/2023
- Accomplished
- Added power poles to shopping list
- Added CANcoders to shopping list
- Inspected Homer's swerve modules, found 2 suspect
- Inventoried IGUS chain
- Found 3 sets of end pieces
- Pulled 2 44in lengths for use on 2023 robot (on black shelves)
- Decided to use IGUS chain for extension
- Rewired CANcoder B (on black shelves)
- Discussed with Nick L and Berkeley about battery placement
- To-Do
- Finish rewiring CANcoder A (on black shelves)
- Select gripper sensors
- Continue to work with Lift/Gripper on sensor placement (ensure some level of adjustibility)
- Rough out locations of Speed Controllers
- Update IO Map
1/22/2023
- Accomplished
- To-Do
1/24/2023
- Accomplished
- To-Do
1/25/2023
- Accomplished
- To-Do
1/26/2023
- Accomplished
- To-Do
1/28/2023
- Accomplished
- To-Do
1/29/2023
- Accomplished
- To-Do
1/31/2023
- Accomplished
- To-Do
2/1/2023
- Accomplished
- To-Do
2/2/2023
- Accomplished
- To-Do
2/4/2023
- Accomplished
- To-Do
2/5/2023
- Accomplished
- To-Do
2/7/2023
- Accomplished
- To-Do
2/8/2023
- Accomplished
- To-Do
2/9/2023
- Accomplished
- To-Do
2/11/2023
- Accomplished
- To-Do
2/12/2023
- Accomplished
- To-Do