Fabrication: Difference between revisions
FieldCrate (talk | contribs) No edit summary |
FieldCrate (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
In order to get parts made a drawing must be completed '''''and''''' the appropriate files must be submitted (see below for drawing and file requirements). Please create a new link on this page (under files to be made) for each part request and include the proper drawing and required files. Any questions at all, please ask Amy Gontarek ([mailto:agontare@harris.com agontare@harris.com]) | In order to get parts made a drawing must be completed '''''and''''' the appropriate files must be submitted (see below for drawing and file requirements). Please create a new link on this page (under files to be made) for each part request and include the proper drawing and required files. Any questions at all, please ask Amy Gontarek ([mailto:agontare@harris.com agontare@harris.com]) | ||
'''Drawing Requirements: '''(use the FIRST/Robotics drawing template under the English tab on the template menu). Save a Copy As .dwg | '''Drawing Requirements: '''(use the FIRST/Robotics drawing template under the English tab on the template menu). Save a Copy As AUTOCAD .dwg (Autocad LT.) | ||
''' '''List Material | ''' '''List Material | ||
Line 262: | Line 262: | ||
| <br>Gontarek 2/4/09 | | <br>Gontarek 2/4/09 | ||
| 10<br> | | 10<br> | ||
| <br> | | 2/6/09<br> | ||
|- | |- | ||
| 2/3/09<br> | | 2/3/09<br> | ||
Line 269: | Line 269: | ||
| Gontarek 2/4/09<br> | | Gontarek 2/4/09<br> | ||
| 6<br> | | 6<br> | ||
| <br> | | 2/6/09<br> | ||
|- | |- | ||
| 2/3/09<br> | | 2/3/09<br> | ||
Line 276: | Line 276: | ||
| Gontarek 2/4/09<br> | | Gontarek 2/4/09<br> | ||
| 1<br> | | 1<br> | ||
| | | | ||
2/6/09 | |||
|- | |- | ||
| 2/3/09<br><br> | | 2/3/09<br><br> | ||
Line 287: | Line 289: | ||
| 1 | | 1 | ||
| | | 2/6/09 | ||
|- | |- | ||
| 2/3/09 | | 2/3/09 | ||
Line 298: | Line 300: | ||
| 4 | | 4 | ||
| | | 2/6/09 | ||
|- | |- | ||
| 2/3/09<br> | | 2/3/09<br> | ||
Line 378: | Line 380: | ||
<u</u> | <u</u> | ||
<br> | |||
<br> | |||
<u>'''Parts Built Elsewhere'''</u> | <u>'''Parts Built Elsewhere'''</u> |
Revision as of 08:08, 9 February 2009
How to Submit Parts
In order to get parts made a drawing must be completed and the appropriate files must be submitted (see below for drawing and file requirements). Please create a new link on this page (under files to be made) for each part request and include the proper drawing and required files. Any questions at all, please ask Amy Gontarek (agontare@harris.com)
Drawing Requirements: (use the FIRST/Robotics drawing template under the English tab on the template menu). Save a Copy As AUTOCAD .dwg (Autocad LT.)
List Material
State Quantity
Provide Overall Dimensions
Name of student who created the drawing
Current Date - this needs to be updated everytime a drawing is submitted to get parts made (this acts as the revision control)
* If it is a sheet metal part to be bent, then the bend radius must be dimensioned along with the feature
* If the part will be welded, then care must be taken to design with the proper dimensioning scheme leaving room for the weldments
File Requirements:
- Machined Parts (think parts with intricate surfaces) - .stp
- OMAX Parts (think flat parts, bar stock to be cut to length) - .dxf
This is basically a stripped down version of the drawing. It should include the face on view of the part (no other views) with no dimensions and should be scaled 1:1 and then use Save a Copy As and save as a .dxf Autocad LT.
Files to be made
Date | Requested Item | Requestor | Ordered By/Date | QTY | RX'd |
---|---|---|---|---|---|
2/3/09 |
trap door end |
Cuyler McC |
10 |
IKE | |
2/3/09 |
shaft 750.idw |
Cuyler McC |
DXF mailed to Kim and given hard copy 2/3 |
8 |
IKE shop |
NOTE:
2/3 - LEFT AND RIGHT FRAMES, WAITING FOR 1 X 1 SQUARE TUBING STOCK TO ARRIVE AT HARRIS SO FRAMES
CAN BE WELDED. ACCORDING TO AMY, STOCK MIGHT BE ON SHIPPING DOCK. SHE WILL CHECK TOMORROW MORNING.
MOST OTHER PARTS AT HARRIS ARE DONE AND AT HER DESK WAITING FOR WELDING. Raw stock received 2/4/09.
Order Status
Date | Requested Item | Requestor | Ordered By/Date | QTY | RX'd |
---|---|---|---|---|---|
1/16/09 | mount_bumper | Josh Gannon | Gontarek - 1/16/09 |
10 - dxf |
1/20/09 |
1/23/09 | gusset upper | Alex Wolf | Gontarek 1/23/09 | 4 -dxf | 1/26/09 |
1/23/09 | 1.75 ball bearing block | Alex Wolf | Gontarek 1/23/09 | 2 - dxf | 1/26/09 |
1/23/09 | ball bearing block tall | Alex Wolf | Gontarek 1/23/09 | 2 - dxf | 1/26/09 |
1/23/09 | ball bearing block | Alex Wolf | Gontarek 1/23/09 | 14 - dxf |
1/26/09 |
1/23/09 | pulley block (bearing block mount) resubmitted 1/27/09 for holes | Alex Wolf | Gontarek 1/23/09 | 14 - dxf | 1/28/09 |
1/23/09 | gusset | Alex Wolf | Gontarek 1/23/09 | 4 -dxf | 1/26/09 |
1/23/09 | ball bearing block mid (bearing block mid 2) | Alex Wolf | Gontarek 1/23/09 | 2 - dxf | 1/26/09 |
1/23/09 | double pulley (ordered near net shape - Harris) | Alex Wolf |
Gontarek 2/2/09 |
12 - dxf | 2/3/09 |
1/23/09 | single pulley (ordered near net shape - Harris) | Alew Wolf | Gontarek 2/2/09 | 16 - dxf | 2/3/09 |
1/26/09 | span foot | Alex Wolf | Gontarek 1/26/09 | 2 - dxf | 1/28/09 |
1/26/09 | right ND motor mount | Alex Wolf | Gontarek 1/26/09 | 1 - dxf | 1/28/09 |
1/26/09 | cross member tie plate 1x1 | Alex Wolf | Gontarek 1/26/09 | 8 - dxf | 1/28/09 |
1/26/09 | conveyor drive motor mounting plate | Alex Wolf | Gontarek 1/26/09 | 3 - dxf | 1/28/09 |
1/28/09 | angle bracket | Alex Wolf | Gontarek 1/28/09 | 2 - dxf | 1/30/09 |
1/29/09 | cross member thread plug | Alex Wolf | Gontarek 1/29/09 | 14 - dxf | 1/30/09 |
1/29/09 | flip box (controls) | Eric Averill | Gontarek 1/29/09 | 1- dxf/weld | 2/3/09 |
1/30/09 | front door base | Alex Wolfe | Gontarek 1/30/09 | 1 - dxf | 2/2/09 |
1/26/09 | conveyor drive motor mount clamp | Alex Wolf |
Gontarek 1/26/09 DXF mailed to Kim and given hard copy 2/3 |
3 - stp | IKE shop |
single pulley | Alex Wolfe |
Blanks from Harris at PHS, DXF mailed to Kim and given hard copy2/3 |
16 | IKE shop | |
double pulley | Alex Wolfe | Blanks from Harris at PHS, DXF mailed to Kim and given hard copy2/3 | 12 | IKE shop | |
2/3/09 |
Top Bracket |
Dean Smith |
Gontarek 2/4/09 |
10 |
2/6/09 |
2/3/09 |
Drawer Bracket |
Dean Smith |
Gontarek 2/4/09 |
6 |
2/6/09 |
2/3/09 |
Bottom Plate |
Dean Smith |
Gontarek 2/4/09 |
1 |
2/6/09 |
2/3/09 |
Frame Cross Tie Weldment 2 | Cuyler McChesney |
Gontarek 2/4/09 Raw stock from PHS- parts to be welded |
1 | 2/6/09 |
2/3/09 | Frame Cross Tie Weldment 1 | Cuyler McChesney |
Gontarek 2/4/09 Raw stock from PHS - parts to be welded |
4 | 2/6/09 |
2/3/09 |
Trap Door End |
DXF mailed to Kim and given hard copy 2/3 |
|||
2/3/09 |
Rear Coupling Aluminum Screw Lock |
On assembly, no drawing made for it. Kyler working on it 2/4 2.5 Dia, x 1/2 thk with a bunch of taped holes |
1 |
? | |
<u</u>
<u</u>
<u</u>
<u</u>
<u</u>
Parts Built Elsewhere
Date | Part Name | Where to Make | Builder/Date | QTY | RX'd |
---|---|---|---|---|---|
2/3/09 |
helper finger |
In House |
On Job Shelf |
4 |
done |
2/3/09 |
banner sensor mounting plate.idw |
In House |
On Job Shelf to mill slots |
2 |
inproc. |
2/3/09 |
banner sensor mount.idw |
In House |
On Job Shelf to mill slots |
2 |
inproc. |
2/3/09 |
Frame Outrigger SubAssembly - Right Side.idw |
In House |
On Job Shelf |
1 |
done |
2/3/09 |
Frame Outrigger SubAssembly - Left Side.idw |
In House |
On Job Shelf |
1 |
done |
2/3/09 |
front door weldment.idw |
In House |
On Job Shelf |
1 |
done |
2/3/09 |
Lower crank.idw |
In House |
On Job Shelf |
1 |
done |
2/3/09 |
Upper crank.idw |
In House |
On Job Shelf stock cut |
1 |
inproc. |
2/3/09 |
modAndyMarkhub.idw |
In House |
On Job Shelf |
1 |
done |
2/3/09 |
joint rod 1 |
In House |
On Job Shelf |
1 |
done |
2/3/09 |
joint rod 2 |
In House |
On Job Shelf |
1 |
done |
2/3/09 |
Banner Photo Eye Mounting Stand-Offs |
In House |
no drawing yet |
2 |
not Started |
2/4/09 |
30" Shaft (Trap Door Pivot Shafts) |
In House |
Drawing done 2/4. Drawing |
2 |
not |
2/4/09 |
Upper Plucker Motor Mount Plate |
In House |
Drawing done 2/4. Drawing on job shelf |
1 |
not Started |
2/4/09 |
Gear Coupling AL Lock |
In House |
Need to finsh drawing and check. Drawing on job shelf for cutting stock only |
1 |
not Started |