== Master To-Do List (In Priority Order w/ Soft Dates)<br> ==
== Master To-Do List (In Priority Order w/ Soft Dates)<br> ==


#<strike>Transfer mock board to real board.&nbsp; This includes cutting proper length cables for the drivetrain and power distribution.</strike><strike>'''(Deadline: Saturday Feb. 7)'''</strike><br>
#<strike>Cut sensor wires to length for drive train (This includes 4 lengths of PWM&nbsp;cables which go to each motor's encoder plus 4 lengths of PWM&nbsp;cables for the mouse)<span style="font-weight: bold"> (Deadline: Saturday Feb. 7)</span></strike>
#<strike>Mount 120A breaker '''(Deadline: Saturday''' '''Feb. 7)'''</strike> velcro'ed but could also add 2 screws  
#<strike>Mount 120A breaker '''(Deadline: Saturday''' '''Feb. 7)'''</strike> velcro'ed but could also add 2 screws  
#<strike>Make at LEAST one fully working mouse (this means having 4 outputs - 2 phases for Up/Down motion and 2 phases for Left/Right motion) '''(Deadline: Saturday Feb. 7)'''</strike>
#<strike>Cut plastic shrouds on any upper assembly motors that have them.&nbsp; Solder (if needed) pigtails on and crimp on quick disconnects (each leg uses a different gender) '''(Deadline: Sunday Feb. 8)'''</strike>
#<strike>Work with Mech on how to mount our panels '''(Deadline: Sunday Feb. 8)'''</strike>
#<strike>Cut upper assembly motor (conveyors, ball shooter, and door motoros ) wires to rough length '''(Deadline: Early Sunday Feb 8 (needs to be done BEFORE upper mechanism is assembled)).'''</strike>
#&nbsp;Cut upper assembly sensor wires (limit switches (2), Omron conveyor sensors (2), Banner ball sensor, Ball shooter encoder) wires to rough length. '''(Deadline: Early Sunday Feb 8 (needs to be done BEFORE upper mechanism is assembled)).'''  
#&nbsp;Cut upper assembly sensor wires (limit switches (2), Omron conveyor sensors (2), Banner ball sensor, Ball shooter encoder) wires to rough length. '''(Deadline: Early Sunday Feb 8 (needs to be done BEFORE upper mechanism is assembled)).'''  
#<strike>Install Battery Box '''(Deadline: Early Tuesday Feb 10 (install this BEFORE&nbsp;upper mechanism is installed or it will be tougher to do!))''''</strike>
#<strike>Route wire/hook up motors in upper assembly with wires prepped in item 7. '''(Deadline: Tuesday Feb 10)'''</strike>
#Route wire/hook up sensors for upper assembly with wires prepped in item 8. '''(Deadline: Tusday Feb 10)'''  
#Route wire/hook up sensors for upper assembly with wires prepped in item 8. '''(Deadline: Tusday Feb 10)'''  
#Make up to 3 spare mice. '''(Deadline: Wednesday Feb 11)'''  
#Make up to 3 spare mice. '''(Deadline: Wednesday Feb 11)'''  
#Fabricate protective electrical cover. '''(Deadline: Wednesday Feb 11)'''  
#Fabricate protective electrical cover. '''(Deadline: Wednesday Feb 11)'''  
#Complete Bill of Materials<span style="font-weight: bold"> (Deadline: Friday Feb 13)</span>  
#Complete Bill of Materials<span style="font-weight: bold;"> (Deadline: Friday Feb 13)</span>  
#<strike>Mount cRIO on its plate and onto robot.&nbsp;&nbsp; Mounting plate is attached to robot Feb 8.</strike>
#Install Battery Box (Deadline: Early Tuesday Feb 10 (install this BEFORE upper mechanism is installed or it will be tougher to do!))'<br>
#Route wire/hook up motors in upper assembly with wires prepped in item 7. (Deadline: Tuesday Feb 10) <br>
#Mount cRIO on its plate and onto robot. Mounting plate is attached to robot Feb 8.<br>
#Transfer mock board to real board. This includes cutting proper length cables for the drivetrain and power distribution.(Deadline: Saturday Feb. 7<br>
#Cut sensor wires to length for drive train (This includes 4 lengths of PWM cables which go to each motor's encoder plus 4 lengths of PWM cables for the mouse) (Deadline: Saturday Feb. 7)<br>
#Make at LEAST one fully working mouse (this means having 4 outputs - 2 phases for Up/Down motion and 2 phases for Left/Right motion) (Deadline: Saturday Feb. 7)
#Cut plastic shrouds on any upper assembly motors that have them. Solder (if needed) pigtails on and crimp on quick disconnects (each leg uses a different gender) (Deadline: Sunday Feb. 8)
#Work with Mech on how to mount our panels (Deadline: Sunday Feb. 8)
#Cut upper assembly motor (conveyors, ball shooter, and door motoros ) wires to rough length (Deadline: Early Sunday Feb 8 (needs to be done BEFORE upper mechanism is assembled)). <br><br>


<br>
<br>  


*<strike>Count up I/O and determine number of side cars necessary</strike>&nbsp; we will make it work with one sidecar (but allow space on the elec board for 2)
*<strike>Count up I/O and determine number of side cars necessary</strike><br>
*<strike>Find/buy Lexan to make protective cover (goes over side electrical board)</strike>&nbsp;<strike>at Harris - need to bring to school</strike>  
*<strike>Find/buy Lexan to make protective cover (goes over side electrical board)</strike>&nbsp;<strike>at Harris - need to bring to school</strike>  
*<strike>Design "homemade" shaft encoder for conveyor motors.</strike>  
*<strike>Design "homemade" shaft encoder for conveyor motors.</strike>  
Line 31: Line 31:
*<strike>Mount Mechanism (Jaguar) controllers on side board (or any other components we have "extra" of, like sidecar)</strike>.<br>
*<strike>Mount Mechanism (Jaguar) controllers on side board (or any other components we have "extra" of, like sidecar)</strike>.<br>


<br>
<br>  


== Electrical Main Subteam's Engineering Notebook  ==
== Electrical Main Subteam's Engineering Notebook  ==
Line 41: Line 41:
[[Electrical 1.11.09|Electrical Main - 1.11.09]]  
[[Electrical 1.11.09|Electrical Main - 1.11.09]]  


'''Week 2 -'''''<b>35 Days Left&nbsp;!!</b>''<br>[[Electrical 1.13.09|Electrical Main - 1.13.09]]<br>[[Electrical 1.14.09|Electrical Main - 1.14.09]]<br>[[Electrical 1.15.09|Electrical Main - 1.15.09]]<br>
'''Week 2 -'''''<b>35 Days Left&nbsp;!!</b>''<br>[[Electrical 1.13.09|Electrical Main - 1.13.09]]<br>[[Electrical 1.14.09|Electrical Main - 1.14.09]]<br>[[Electrical 1.15.09|Electrical Main - 1.15.09]]<br>  


[[Electrical Main 1.17.2009|Electrical Main - 1.17.09]]  
[[Electrical Main 1.17.2009|Electrical Main - 1.17.09]]  
Line 51: Line 51:
[[Electricla Main - 1.20.09|Electrical Main - 1.20.09]]  
[[Electricla Main - 1.20.09|Electrical Main - 1.20.09]]  


[[Electricla Main - 1.21.09|Electrical Main - 1.21.09]]<br>
[[Electricla Main - 1.21.09|Electrical Main - 1.21.09]]<br>  


[[Electrical Main - 1.22.09]]  
[[Electrical Main - 1.22.09]]  
Line 69: Line 69:
[[Electrical Main 1.31.09|Electrical Main 1.31.09]]  
[[Electrical Main 1.31.09|Electrical Main 1.31.09]]  


[[Electrical Main 2.1.09|Electrical Main 2.1.09]][[Electrical Main 2.3.09|<br>]]
[[Electrical Main 2.1.09|Electrical Main 2.1.09]][[Electrical Main 2.3.09|<br>]]  


'''Week 5 - '''''<b>14 Days Left&nbsp;!!!!!</b>''  
'''Week 5 - '''''<b>14 Days Left&nbsp;!!!!!</b>''  
Line 99: Line 99:
[[Electrical Main 2.15.09]]  
[[Electrical Main 2.15.09]]  


<br>
<br>  


<br>
<br>  


== Component/Component Specifications  ==
== Component/Component Specifications  ==
Line 129: Line 129:
[[Mouse details|Mouse Details]]  
[[Mouse details|Mouse Details]]  


[[Breaker Information]]<br>
[[Breaker Information]]<br>  


== Links to Other Subteams' Important Stuff  ==
== Links to Other Subteams' Important Stuff  ==

Revision as of 16:05, 13 February 2009

Master To-Do List (In Priority Order w/ Soft Dates)

  1. Mount 120A breaker (Deadline: Saturday Feb. 7) velcro'ed but could also add 2 screws
  2.  Cut upper assembly sensor wires (limit switches (2), Omron conveyor sensors (2), Banner ball sensor, Ball shooter encoder) wires to rough length. (Deadline: Early Sunday Feb 8 (needs to be done BEFORE upper mechanism is assembled)).
  3. Route wire/hook up sensors for upper assembly with wires prepped in item 8. (Deadline: Tusday Feb 10)
  4. Make up to 3 spare mice. (Deadline: Wednesday Feb 11)
  5. Fabricate protective electrical cover. (Deadline: Wednesday Feb 11)
  6. Complete Bill of Materials (Deadline: Friday Feb 13)
  7. Install Battery Box (Deadline: Early Tuesday Feb 10 (install this BEFORE upper mechanism is installed or it will be tougher to do!))'
  8. Route wire/hook up motors in upper assembly with wires prepped in item 7. (Deadline: Tuesday Feb 10)
  9. Mount cRIO on its plate and onto robot. Mounting plate is attached to robot Feb 8.
  10. Transfer mock board to real board. This includes cutting proper length cables for the drivetrain and power distribution.(Deadline: Saturday Feb. 7
  11. Cut sensor wires to length for drive train (This includes 4 lengths of PWM cables which go to each motor's encoder plus 4 lengths of PWM cables for the mouse) (Deadline: Saturday Feb. 7)
  12. Make at LEAST one fully working mouse (this means having 4 outputs - 2 phases for Up/Down motion and 2 phases for Left/Right motion) (Deadline: Saturday Feb. 7)
  13. Cut plastic shrouds on any upper assembly motors that have them. Solder (if needed) pigtails on and crimp on quick disconnects (each leg uses a different gender) (Deadline: Sunday Feb. 8)
  14. Work with Mech on how to mount our panels (Deadline: Sunday Feb. 8)
  15. Cut upper assembly motor (conveyors, ball shooter, and door motoros ) wires to rough length (Deadline: Early Sunday Feb 8 (needs to be done BEFORE upper mechanism is assembled)).


  • Count up I/O and determine number of side cars necessary
  • Find/buy Lexan to make protective cover (goes over side electrical board) at Harris - need to bring to school
  • Design "homemade" shaft encoder for conveyor motors.
  • Communicate sensor mountings to Mechanical teams.- Integration
  • Re-determine model positions- "Who's this model?" -oranges "I didn't know we had a model." -apples @_@;;;
  • Order E7P Encoder
  • Assist Mechanical with Battery/CRio Mount
  • Get Set of Same Mice (backups)      Ordered  Received
  • Final Electrical Mounting Design
  • Design Protection for Electronics on Outside of Bot (or get help from Mechanical)
  • Mount Mechanism (Jaguar) controllers on side board (or any other components we have "extra" of, like sidecar).


Electrical Main Subteam's Engineering Notebook

Week 1 - 42 Days Left !

Electrical Main - 1.06.09
Electrical Main - 1.07.09
Electrical Main - 1.08.09
Electrical Main - 1.10.09

Electrical Main - 1.11.09

Week 2 -35 Days Left !!
Electrical Main - 1.13.09
Electrical Main - 1.14.09
Electrical Main - 1.15.09

Electrical Main - 1.17.09

Electrical Main - 1.18.09

Week 3 - 28 Days Left !!!

Electrical Main - 1.20.09

Electrical Main - 1.21.09

Electrical Main - 1.22.09

Electrical Main - 1.24.09

Electrical Main - 1.25.09

Week 4 - 21 Days Left !!!!

Electrical Main 1.27.09

Electrical Main 1.28.09

Electrical Main 1.29.09

Electrical Main 1.31.09

Electrical Main 2.1.09

Week 5 - 14 Days Left !!!!!

Electrical Main 2.3.09

Electrical Main 2.4.09

Electrical Main 2.5.09

Electrical Main 2.7.09

Electrical Main 2.8.09

Week 6 - 7 Days Left !!!!!!

Electrical Main 2.9.09

Electrical Main 2.10.09

Electrical Main 2.11.09

Electrical Main 2.12.09

Electrical Main 2.13.09

Electrical Main 2.14.09

Electrical Main 2.15.09



Component/Component Specifications

Electrical System Summary

Jaguar Speed Controllers

Victor 884 Speed Controllers

2009 KOP Motors Spreadsheet (Chief Delphi)

Motor Characteristics

Sensors

Servos

Micro Switches

Inventory

Electrical Board Inventor

Electrical Board Cover Inventor

Mouse Details

Breaker Information

Links to Other Subteams' Important Stuff

IO_Map


Electrical Fun

Defining Dave Apples and Dave Oranges!!


Please Label All Notebook Pages Electrical Main X.XX.2009 to avoid confusion.