2010:Integration Status: Difference between revisions
No edit summary |
m (Updating pages) |
||
Line 19: | Line 19: | ||
[[Integration 1.16.2010|Saturday 1/16/2010]] | [[Integration 1.16.2010|Saturday 1/16/2010]] | ||
<br> | <br> | ||
[[Integration 1.19 | [[2010:Integration 1.19|Tuesday 1/19/2010]] | ||
<br> | <br> | ||
[[Integration 1.21 | [[2010:Integration 1.21|Thursday 1/21/2010]] | ||
<br> | <br> | ||
[[Integration 1.23 | [[2010:Integration 1.23|Saturday 1/23/2010]] | ||
<br> | <br> | ||
[[Integration 1.26.2010|Saturday 1/26/2010]] | [[Integration 1.26.2010|Saturday 1/26/2010]] | ||
Line 109: | Line 109: | ||
| | | | ||
|} | |} | ||
== Archives == | == Archives == | ||
* [[2009:Integration Status|2009 Integration Status Page]] | * [[2009:Integration Status|2009 Integration Status Page]] |
Revision as of 10:47, 24 January 2010
Bill of Materials
Subteams, please use the attached template to update the Bill of Materials!! Please ONLY use your own sheet (see tabs on the bottom), and upload it to the Wiki under the name BOM_(subteam).xls. For Example Drivetrain would be BOM_Drivetrain.xls. You can then update that file over and over again, and the wiki will save all of the revisions, so there is NO NEED to put a Date on it.
No 2010 template yet - check back later; we may not use .xls this year
Integration Status
Subteams, please used the attached document to format your integration notes for the meeting. They can be handwritten or typed, it is just a reminder for what info you need to provide.
Media:IntegrationSheet.doc
'Note: being updated for 2010!'
Also please make sure to update the Robot Design page as you add details to your designs!!
Integration Meetings are times & location tbd.
Integration Meeting Notes
Saturday 1/16/2010
Tuesday 1/19/2010
Thursday 1/21/2010
Saturday 1/23/2010
Saturday 1/26/2010
Saturday 1/28/2010
Saturday 1/30/2010
Saturday 2/2/2010
Saturday 2/4/2010
Saturday 2/6/2010
Saturday 2/9/2010
Saturday 2/11/2010
Saturday 2/13/2010
Saturday 2/16/2010
Saturday 2/18/2010
Saturday 2/20/2010
Parts Needed To Buy
Please use the Shopping List Page!
Parts Needing To Be Made
Please use the Fabrication Page!
Subteam Issue Tracking
Date | Issue Description | Needed By (subteam) | Assigned To (subteam) | Date Needed | Complete |
Completed Issues
Date | Issue Description | Needed By (subteam) | Assigned To (subteam) | Date Needed | Complete |