2010:Field/Crate: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
FieldCrate (talk | contribs) No edit summary |
No edit summary |
||
Line 30: | Line 30: | ||
#Need lots of strong velcro- hefty Hefty HEFTY | #Need lots of strong velcro- hefty Hefty HEFTY | ||
<br> | <br> | ||
= This is the Field/Crate Subteam's Engineering Notebook = | = This is the Field/Crate Subteam's Engineering Notebook = | ||
Line 39: | Line 39: | ||
'''Week 2'''<br>[[2010:FieldCrate 01:19]]<br>[[2010:FieldCrate 01:20]]<br>[[2010:FieldCrate 01:21]]<br>[[2010:FieldCrate 01:23]]<br>[[2010:FieldCrate 01:24]]<br> | '''Week 2'''<br>[[2010:FieldCrate 01:19]]<br>[[2010:FieldCrate 01:20]]<br>[[2010:FieldCrate 01:21]]<br>[[2010:FieldCrate 01:23]]<br>[[2010:FieldCrate 01:24]]<br> | ||
'''Week 3''' | |||
[[2010:FieldCrate 01:27]] | |||
[[2010:FieldCrate 01:28]] | |||
Engineering Notebook Templates are available at: [[Engineering Notebook Template|Engineering_Notebook_Template]]<br>'''''Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!''''' | Engineering Notebook Templates are available at: [[Engineering Notebook Template|Engineering_Notebook_Template]]<br>'''''Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!''''' |
Revision as of 17:17, 27 January 2010
Master Task List
- Complete 1 bump, 1 platform, and 1 tower for team testing
- Purchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goals
Complete rest of bumps (12)1/24- Complete Goals and Goal Ramps (4)
- Complete ball returns and towers (2)
Make Tridents (2)1/23- Create vision targets (4)
- Look to see if crate or alliance station walls need maintenance or improvment
- Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate.
- Make sure the crate still has the applicable shelves.
1/26 Additions:
- Determine carpet
- Determine coefficient of friction of spandex vs foam by its self
- Create shopping list for ball returns
Assemble last goal front ramp1/26- 4 angle pieces for front of goals
- Create tops for 3 goals
- Do we have enough soccer balls?
- Look at full field current model- how to integrate goals- over goal wall with vision targets
- Goal netting for sides?
- Lag bolts for tower 4X4s
- Determine final connections of bumps, towers, and platforms to carpet and field sides
- Cut notches (2) in 4 bumps for tower 4X4 connections
- Re-print 4 vision targets
- Our versions of the 3 remaining corrals
- Need lots of strong velcro- hefty Hefty HEFTY
This is the Field/Crate Subteam's Engineering Notebook
Week 1
2010:FieldCrate 01:10
2010:FieldCrate 01:12
2010:FieldCrate 01:13
2010:FieldCrate 01:14
2010:FieldCrate 01:16
2010:FieldCrate 01:17
Week 2
2010:FieldCrate 01:19
2010:FieldCrate 01:20
2010:FieldCrate 01:21
2010:FieldCrate 01:23
2010:FieldCrate 01:24
Week 3
Engineering Notebook Templates are available at: Engineering_Notebook_Template
Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!