2010:Field/Crate: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 42: Line 42:
'''Week 3'''  
'''Week 3'''  


[[2010:FieldCrate 01:27]]<br>[[2010:FieldCrate 01:28]]  
[[2010:FieldCrate 01:27]]<br>[[2010:FieldCrate 01:28]]<br>[[2010:FieldCrate 01:29]]  


Engineering Notebook Templates are available at: [[Engineering Notebook Template|Engineering_Notebook_Template]]<br>'''''Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!'''''
Engineering Notebook Templates are available at: [[Engineering Notebook Template|Engineering_Notebook_Template]]<br>'''''Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!'''''  


= Archives  =
= Archives  =


*[[2009:Field/Crate|2009 Field/Crate Main Page]]
*[[2009:Field/Crate|2009 Field/Crate Main Page]]

Revision as of 17:20, 27 January 2010

Master Task List

  1. Complete 1 bump, 1 platform, and 1 tower for team testing
  2. Purchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goals 
  3. Complete rest of bumps (12) 1/24
  4. Complete Goals and Goal Ramps (4) 
  5. Complete ball returns and towers  (2)
  6. Make Tridents (2) 1/23
  7. Create vision targets (4) 
  8. Look to see if crate or alliance station walls need maintenance or improvment
  9. Verify that the crate dimensions are the same as last year.  Determine if we need to alter the crate.
  10. Make sure the crate still has the applicable shelves.

1/26 Additions:

  1. Determine carpet
  2. Determine coefficient of friction of spandex vs foam by its self
  3. Create shopping list for ball returns
  4. Assemble last goal front ramp 1/26
  5. 4 angle pieces for front of goals
  6. Create tops for 3 goals
  7. Do we have enough soccer balls?
  8. Look at full field current model- how to integrate goals- over goal wall with vision targets
  9. Goal netting for sides?
  10. Lag bolts for tower 4X4s
  11. Determine final connections of bumps, towers, and platforms to carpet and field sides
  12. Cut notches (2) in 4 bumps for tower 4X4 connections
  13. Re-print 4 vision targets
  14. Our versions of the 3 remaining corrals
  15. Need lots of strong velcro- hefty Hefty HEFTY


This is the Field/Crate Subteam's Engineering Notebook

Week 1

2010:FieldCrate 01:10
2010:FieldCrate 01:12
2010:FieldCrate 01:13
2010:FieldCrate 01:14
2010:FieldCrate 01:16
2010:FieldCrate 01:17

Week 2
2010:FieldCrate 01:19
2010:FieldCrate 01:20
2010:FieldCrate 01:21
2010:FieldCrate 01:23
2010:FieldCrate 01:24

Week 3

2010:FieldCrate 01:27
2010:FieldCrate 01:28
2010:FieldCrate 01:29

Engineering Notebook Templates are available at: Engineering_Notebook_Template
Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!

Archives