2010:Field/Crate: Difference between revisions
FieldCrate (talk | contribs) No edit summary |
FieldCrate (talk | contribs) No edit summary |
||
Line 22: | Line 22: | ||
#Do we have enough soccer balls? | #Do we have enough soccer balls? | ||
#Look at full field current model- how to integrate goals- over goal wall with vision targets | #Look at full field current model- how to integrate goals- over goal wall with vision targets | ||
#Goal netting for sides? | #<strike>Goal netting for sides?</strike> Ordered 1/28 | ||
#Lag bolts for tower 4X4s | #Lag bolts for tower 4X4s | ||
#Determine final connections of bumps, towers, and platforms to carpet and field sides | #Determine final connections of bumps, towers, and platforms to carpet and field sides | ||
Line 30: | Line 30: | ||
#Need lots of strong velcro- hefty Hefty HEFTY | #Need lots of strong velcro- hefty Hefty HEFTY | ||
<br> | <br> | ||
= This is the Field/Crate Subteam's Engineering Notebook = | = This is the Field/Crate Subteam's Engineering Notebook = |
Revision as of 18:49, 28 January 2010
Master Task List
- Complete 1 bump, 1 platform, and 1 tower for team testing
- Purchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goals
Complete rest of bumps (12)1/24- Complete Goals and Goal Ramps (4)
- Complete ball returns and towers (2)
Make Tridents (2)1/23- Create vision targets (4)
- Look to see if crate or alliance station walls need maintenance or improvment
- Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate.
- Make sure the crate still has the applicable shelves.
1/26 Additions:
- Determine carpet
- Determine coefficient of friction of spandex vs foam by its self
- Create shopping list for ball returns
Assemble last goal front ramp1/26- 4 angle pieces for front of goals
- Create tops for 3 goals
- Do we have enough soccer balls?
- Look at full field current model- how to integrate goals- over goal wall with vision targets
Goal netting for sides?Ordered 1/28- Lag bolts for tower 4X4s
- Determine final connections of bumps, towers, and platforms to carpet and field sides
- Cut notches (2) in 4 bumps for tower 4X4 connections
- Re-print 4 vision targets
- Our versions of the 3 remaining corrals
- Need lots of strong velcro- hefty Hefty HEFTY
This is the Field/Crate Subteam's Engineering Notebook
Week 1
2010:FieldCrate 01:10
2010:FieldCrate 01:12
2010:FieldCrate 01:13
2010:FieldCrate 01:14
2010:FieldCrate 01:16
2010:FieldCrate 01:17
Week 2
2010:FieldCrate 01:19
2010:FieldCrate 01:20
2010:FieldCrate 01:21
2010:FieldCrate 01:23
2010:FieldCrate 01:24
Week 3
2010:FieldCrate 01:26
2010:FieldCrate 01:27
2010:FieldCrate 01:28
2010:FieldCrate 01:30
2010:FieldCrate 01:31
Week 4
2010:FieldCrate 02:02
2010:FieldCrate 02:03
2010:FieldCrate 02:04
2010:FieldCrate 02:06
2010:FieldCrate 02:07
Week 5
2010:FieldCrate 02:09
2010:FieldCrate 02:10
2010:FieldCrate 02:11
2010:FieldCrate 02:13
2010:FieldCrate 02:14
Week 6
2010:FieldCrate 02:16
2010:FieldCrate 02:17
2010:FieldCrate 02:18
2010:FieldCrate 02:20
2010:FieldCrate 02:21
Engineering Notebook Templates are available at: Engineering_Notebook_Template
Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!