2010:Field/Crate: Difference between revisions
FieldCrate (talk | contribs) No edit summary |
FieldCrate (talk | contribs) No edit summary |
||
Line 18: | Line 18: | ||
#<strike>Create shopping list for ball returns</strike> Material bought on McMaster 1/28 and at Home Depot 1/30 | #<strike>Create shopping list for ball returns</strike> Material bought on McMaster 1/28 and at Home Depot 1/30 | ||
#<strike>Assemble last goal front ramp</strike> 1/26 | #<strike>Assemble last goal front ramp</strike> 1/26 | ||
#<strike>4 angle pieces for front of goals</strike> 2/2 | #<strike>4 angle pieces for front of goals</strike> 2/2 | ||
#<strike>Create tops for 3 goals</strike> 1/31 | #<strike>Create tops for 3 goals</strike> 1/31 | ||
#Do we have enough soccer balls? | #Do we have enough soccer balls? | ||
Line 27: | Line 27: | ||
#Cut notches (2) in 4 bumps for tower 4X4 connections | #Cut notches (2) in 4 bumps for tower 4X4 connections | ||
#Re-print 4 vision targets | #Re-print 4 vision targets | ||
#Our versions of the 3 remaining corrals | #''Our versions of the 3 remaining corrals''- Solution: Theo will provide construction fence (orange/plastic)<br> | ||
#Need lots of strong velcro- hefty Hefty HEFTY | #Need lots of strong velcro- hefty Hefty HEFTY | ||
#Carpet (12) bumps | #Carpet (12) bumps | ||
#Wrap foam in spandex | #Wrap foam in spandex | ||
#Attache Foam to inside of goals | #Attache Foam to inside of goals | ||
#Determine Back frame for vision targets | |||
#Fix (glue) trident that is currently not attached completely. | |||
<br> | <br> | ||
= This is the Field/Crate Subteam's Engineering Notebook = | = This is the Field/Crate Subteam's Engineering Notebook = | ||
Line 39: | Line 41: | ||
'''Week 1''' | '''Week 1''' | ||
2010:FieldCrate 01:10<br>2[[2010:FieldCrate 01:12|010:FieldCrate 01:12]]<br>[[2010:FieldCrate 01:13]]<br>[[2010:FieldCrate 01:14]]<br>[[2010:FieldCrate 01:16]]<br>[[2010:FieldCrate 01:17]]<br> | 2010:FieldCrate 01:10<br>2[[2010:FieldCrate 01:12|010:FieldCrate 01:12]]<br>[[2010:FieldCrate 01:13]]<br>[[2010:FieldCrate 01:14]]<br>[[2010:FieldCrate 01:16]]<br>[[2010:FieldCrate 01:17]]<br> | ||
'''Week 2'''<br>[[2010:FieldCrate 01:19]]<br>[[2010:FieldCrate 01:20]]<br>[[2010:FieldCrate 01:21]]<br>[[2010:FieldCrate 01:23]]<br>[[2010:FieldCrate 01:24]]<br> | '''Week 2'''<br>[[2010:FieldCrate 01:19]]<br>[[2010:FieldCrate 01:20]]<br>[[2010:FieldCrate 01:21]]<br>[[2010:FieldCrate 01:23]]<br>[[2010:FieldCrate 01:24]]<br> | ||
'''Week 3''' | '''Week 3''' |
Revision as of 16:50, 3 February 2010
Master Task List
Complete 1 bump, 1 platform, and 1 tower for team testingPurchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goalsComplete rest of bumps (12)1/24Complete Goals and Goal Ramps (4)2/2- Complete ball returns and towers (2)
Make Tridents (2)1/23- Create vision targets (4)
- Look to see if crate or alliance station walls need maintenance or improvment
- Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate.
- Make sure the crate still has the applicable shelves.
1/26 Additions:
Determine carpetPurchased 1/30/10Determine coefficient of friction of spandex vs foam by its selfSpandex will be used 1/30/10Create shopping list for ball returnsMaterial bought on McMaster 1/28 and at Home Depot 1/30Assemble last goal front ramp1/264 angle pieces for front of goals2/2Create tops for 3 goals1/31- Do we have enough soccer balls?
- Look at full field current model- how to integrate goals- over goal wall with vision targets
Goal netting for sides?Ordered 1/28Lag bolts for tower 4X4sOrdered 1/28 - McMaster- Determine final connections of bumps, towers, and platforms to carpet and field sides
- Cut notches (2) in 4 bumps for tower 4X4 connections
- Re-print 4 vision targets
- Our versions of the 3 remaining corrals- Solution: Theo will provide construction fence (orange/plastic)
- Need lots of strong velcro- hefty Hefty HEFTY
- Carpet (12) bumps
- Wrap foam in spandex
- Attache Foam to inside of goals
- Determine Back frame for vision targets
- Fix (glue) trident that is currently not attached completely.
This is the Field/Crate Subteam's Engineering Notebook
Week 1
2010:FieldCrate 01:10
2010:FieldCrate 01:12
2010:FieldCrate 01:13
2010:FieldCrate 01:14
2010:FieldCrate 01:16
2010:FieldCrate 01:17
Week 2
2010:FieldCrate 01:19
2010:FieldCrate 01:20
2010:FieldCrate 01:21
2010:FieldCrate 01:23
2010:FieldCrate 01:24
Week 3
2010:FieldCrate 01:26
2010:FieldCrate 01:27
2010:FieldCrate 01:28
2010:FieldCrate 01:30
2010:FieldCrate 01:31
Week 4
2010:FieldCrate 02:02
2010:FieldCrate 02:03
2010:FieldCrate 02:04
2010:FieldCrate 02:06
2010:FieldCrate 02:07
Week 5
2010:FieldCrate 02:09
2010:FieldCrate 02:10
2010:FieldCrate 02:11
2010:FieldCrate 02:13
2010:FieldCrate 02:14
Week 6
2010:FieldCrate 02:16
2010:FieldCrate 02:17
2010:FieldCrate 02:18
2010:FieldCrate 02:20
2010:FieldCrate 02:21
Engineering Notebook Templates are available at: Engineering_Notebook_Template
Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!