2010:Field/Crate: Difference between revisions
FieldCrate (talk | contribs) No edit summary |
FieldCrate (talk | contribs) No edit summary |
||
Line 8: | Line 8: | ||
#<strike>Make Tridents (2) </strike>1/23 | #<strike>Make Tridents (2) </strike>1/23 | ||
#Create vision targets (4) | #Create vision targets (4) | ||
#Look to see if crate or alliance station walls need maintenance or improvment | #<strike>Look to see if crate or alliance station walls need maintenance or improvment</strike> | ||
#Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate. | #Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate. | ||
#Make sure the crate still has the applicable shelves. | #<strike>Make sure the crate still has the applicable shelves. </strike>Shelves are in the closet | ||
'''1/26''' '''Additions:''' | '''1/26''' '''Additions:''' | ||
Line 20: | Line 20: | ||
#<strike>4 angle pieces for front of goals</strike> 2/2 | #<strike>4 angle pieces for front of goals</strike> 2/2 | ||
#<strike>Create tops for 3 goals</strike> 1/31 | #<strike>Create tops for 3 goals</strike> 1/31 | ||
#Do we have enough soccer balls?(need 12) & ball pump<br> | #Do we have enough soccer balls?(need 12) & ball pump<br> | ||
#Look at full field current model- how to integrate goals- over goal wall with vision targets | #Look at full field current model- <strike>how to integrate goals</strike>- over goal wall with vision targets | ||
#<strike>Goal netting for sides?</strike> Ordered 1/28 | #<strike>Goal netting for sides?</strike> Ordered 1/28 | ||
#<strike>Lag bolts for tower 4X4s</strike> Ordered 1/28 - McMaster | #<strike>Lag bolts for tower 4X4s</strike> Ordered 1/28 - McMaster | ||
Line 27: | Line 27: | ||
#Cut notches (2) in 4 bumps for tower 4X4 connections | #Cut notches (2) in 4 bumps for tower 4X4 connections | ||
#Re-print 4 vision targets | #Re-print 4 vision targets | ||
#''Our versions of the 3 remaining corrals''- Solution: Theo will provide construction fence (orange/plastic)<br> | #''Our versions of the 3 remaining corrals''- Solution: Theo will provide construction fence (orange/plastic)<br> | ||
#Need lots of strong velcro- hefty Hefty HEFTY | #Need lots of strong velcro- hefty Hefty HEFTY | ||
#Carpet (12) bumps | #Carpet (12) bumps | ||
#<strike>Wrap foam in spandex</strike> 2/3 | #<strike>Wrap foam in spandex</strike> 2/3 | ||
#Attache Foam to inside of goals | #Attache Foam to inside of goals | ||
#Determine Back frame for vision targets | #Determine Back frame for vision targets |
Revision as of 16:19, 4 February 2010
Master Task List
Complete 1 bump, 1 platform, and 1 tower for team testingPurchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goalsComplete rest of bumps (12)1/24Complete Goals and Goal Ramps (4)2/2- Complete ball returns and towers (2)
Make Tridents (2)1/23- Create vision targets (4)
Look to see if crate or alliance station walls need maintenance or improvment- Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate.
Make sure the crate still has the applicable shelves.Shelves are in the closet
1/26 Additions:
Determine carpetPurchased 1/30/10Determine coefficient of friction of spandex vs foam by its selfSpandex will be used 1/30/10Create shopping list for ball returnsMaterial bought on McMaster 1/28 and at Home Depot 1/30Assemble last goal front ramp1/264 angle pieces for front of goals2/2Create tops for 3 goals1/31- Do we have enough soccer balls?(need 12) & ball pump
- Look at full field current model-
how to integrate goals- over goal wall with vision targets Goal netting for sides?Ordered 1/28Lag bolts for tower 4X4sOrdered 1/28 - McMaster- Determine final connections of bumps, towers, and platforms to carpet and field sides
- Cut notches (2) in 4 bumps for tower 4X4 connections
- Re-print 4 vision targets
- Our versions of the 3 remaining corrals- Solution: Theo will provide construction fence (orange/plastic)
- Need lots of strong velcro- hefty Hefty HEFTY
- Carpet (12) bumps
Wrap foam in spandex2/3- Attache Foam to inside of goals
- Determine Back frame for vision targets
- Fix (glue) trident that is currently not attached completely.
This is the Field/Crate Subteam's Engineering Notebook
Week 1
2010:FieldCrate 01:10
2010:FieldCrate 01:12
2010:FieldCrate 01:13
2010:FieldCrate 01:14
2010:FieldCrate 01:16
2010:FieldCrate 01:17
Week 2
2010:FieldCrate 01:19
2010:FieldCrate 01:20
2010:FieldCrate 01:21
2010:FieldCrate 01:23
2010:FieldCrate 01:24
Week 3
2010:FieldCrate 01:26
2010:FieldCrate 01:27
2010:FieldCrate 01:28
2010:FieldCrate 01:30
2010:FieldCrate 01:31
Week 4
2010:FieldCrate 02:02
2010:FieldCrate 02:03
2010:FieldCrate 02:04
2010:FieldCrate 02:06
2010:FieldCrate 02:07
Week 5
2010:FieldCrate 02:09
2010:FieldCrate 02:10
2010:FieldCrate 02:11
2010:FieldCrate 02:13
2010:FieldCrate 02:14
Week 6
2010:FieldCrate 02:16
2010:FieldCrate 02:17
2010:FieldCrate 02:18
2010:FieldCrate 02:20
2010:FieldCrate 02:21
Engineering Notebook Templates are available at: Engineering_Notebook_Template
Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!