2010:Field/Crate: Difference between revisions
FieldCrate (talk | contribs) No edit summary |
FieldCrate (talk | contribs) No edit summary |
||
Line 9: | Line 9: | ||
#Create vision targets (4) | #Create vision targets (4) | ||
#<strike>Look to see if crate or alliance station walls need maintenance or improvment</strike> | #<strike>Look to see if crate or alliance station walls need maintenance or improvment</strike> | ||
#Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate. | #Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate.''(Our crate is 48" x 48" x 69")'' | ||
#<strike>Make sure the crate still has the applicable shelves. </strike>''Shelves are in the close''t | #<strike>Make sure the crate still has the applicable shelves. </strike>''Shelves are in the close''t | ||
Line 33: | Line 33: | ||
#<strike>Attache Foam to inside of goals</strike> 2/6 | #<strike>Attache Foam to inside of goals</strike> 2/6 | ||
#Determine Back frame for vision targets | #Determine Back frame for vision targets | ||
#<strike>Fix (glue) trident that is currently not attached completely. </strike>2/7 | #<strike>Fix (glue) trident that is currently not attached completely. </strike>2/7 | ||
#Cut soccer netting | #Cut soccer netting | ||
Revision as of 13:40, 7 February 2010
Master Task List
Complete 1 bump, 1 platform, and 1 tower for team testingPurchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goalsComplete rest of bumps (12)1/24Complete Goals and Goal Ramps (4)2/2- Complete ball returns and towers (2)
Make Tridents (2)1/23- Create vision targets (4)
Look to see if crate or alliance station walls need maintenance or improvment- Verify that the crate dimensions are the same as last year. Determine if we need to alter the crate.(Our crate is 48" x 48" x 69")
Make sure the crate still has the applicable shelves.Shelves are in the closet
1/26 Additions:
Determine carpetPurchased 1/30/10Determine coefficient of friction of spandex vs foam by its selfSpandex will be used 1/30/10Create shopping list for ball returnsMaterial bought on McMaster 1/28 and at Home Depot 1/30Assemble last goal front ramp1/264 angle pieces for front of goals2/2Create tops for 3 goals1/31- Do we have enough soccer balls?(need 12) & ball pump Theo will contact Phys. Ed. Dept for loan
- Look at full field current model-
how to integrate goals- over goal wall with vision targets Goal netting for sides?Ordered 1/28Lag bolts for tower 4X4sOrdered 1/28 - McMaster- Determine final connections of bumps, towers, and platforms to carpet and field sides
Cut notches (2) in 4 bumps for tower 4X4 connections2/6- Re-print 4 vision targets
- Our versions of the 3 remaining corrals- Solution: Theo will provide construction fence (orange/plastic)
Need lots of strong velcro- hefty Hefty HEFTYOrdered from Mcmaster 2/4Carpet (12) bumps2/6Wrap foam in spandex2/3Attache Foam to inside of goals2/6- Determine Back frame for vision targets
Fix (glue) trident that is currently not attached completely.2/7- Cut soccer netting
This is the Field/Crate Subteam's Engineering Notebook
Week 1
2010:FieldCrate 01:10
2010:FieldCrate 01:12
2010:FieldCrate 01:13
2010:FieldCrate 01:14
2010:FieldCrate 01:16
2010:FieldCrate 01:17
Week 2
2010:FieldCrate 01:19
2010:FieldCrate 01:20
2010:FieldCrate 01:21
2010:FieldCrate 01:23
2010:FieldCrate 01:24
Week 3
2010:FieldCrate 01:26
2010:FieldCrate 01:27
2010:FieldCrate 01:28
2010:FieldCrate 01:30
2010:FieldCrate 01:31
Week 4
2010:FieldCrate 02:02
2010:FieldCrate 02:03
2010:FieldCrate 02:04
2010:FieldCrate 02:06
2010:FieldCrate 02:07
Week 5
2010:FieldCrate 02:09
2010:FieldCrate 02:10
2010:FieldCrate 02:11
2010:FieldCrate 02:13
2010:FieldCrate 02:14
Week 6
2010:FieldCrate 02:16
2010:FieldCrate 02:17
2010:FieldCrate 02:18
2010:FieldCrate 02:20
2010:FieldCrate 02:21
Engineering Notebook Templates are available at: Engineering_Notebook_Template
Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!