2010:Integration Status: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(dont need draft status anymore)
(Updated Issues Tracking)
Line 57: Line 57:
=== Subteam Issue Tracking   ===
=== Subteam Issue Tracking   ===


{| cellspacing="1" cellpadding="0" border="1" align="left" width="800"
{| width="800" cellspacing="1" cellpadding="0" border="1" align="left"
|-
|-
| '''Date'''  
| '''Date'''  
Line 70: Line 70:
| Electrical Main  
| Electrical Main  
| Mech1, Mech 2, Drive  
| Mech1, Mech 2, Drive  
| <br>
| 1/15
| <br>
| NO
|-
|-
| 1/8  
| 1/8  
Line 77: Line 77:
| Mechanical 1<br>  
| Mechanical 1<br>  
| Mechanical 2<br>  
| Mechanical 2<br>  
| <br>
| 1/18
| <br>
| NO
|-
| 1/13
| Need to define space allowed for electronics &amp; systems
| Mechanical 1, Electrical
| Mechanical 2
| <br>
| <br>
|-
|-
| 1/13  
| 1/13  
Line 91: Line 84:
| Electrical, Programming  
| Electrical, Programming  
| Programming, Mechanical  
| Programming, Mechanical  
| <br>
| 1/18
| <br>
| NO
|-
|-
| 1/13  
| 1/13  
Line 98: Line 91:
| Programming  
| Programming  
| Mechanical  
| Mechanical  
| <br>
| 1/18
| <br>
| NO
|-
|-
| 1/13  
| 1/13  
Line 105: Line 98:
| Programming  
| Programming  
| Elec Controls  
| Elec Controls  
| <br>
| 1/21
| <br>
| NO
|-
| 1/15
| Determine if Encoder Wheel Needed
| Electrical/Mechanical
| Programming
| 1/17
| YES
|-
| 1/15
| Help Port ProE into Inventor
| Drivetrain
| Mechanical
| 1/18
| NO
|-
| 1/17
| Need to Weight Balance
| Mechanical
| Elec, Mechanical, Drive
| 1/31
| NO
|-
|
|
|
|
|
|  
|}
|}


<br>
<br>

Revision as of 11:59, 17 January 2009

Integration Status

Subteams, please used the attached document to format your integration notes for the meeting. They can be handwritten or typed, it is just a reminder for what info you need to provide.

Media:IntegrationSheet.doc

Also please make sure to update the Robot Design page as you add details to your designs!!

Integration Meetings are Tuesday & Thursday at 5:30PM, and Saturday at 1:00PM in F2 Back Room.

Integration Meeting Notes

Thursday 1/8/2009

Saturday 1/10/2009

Tuesday 1/13/2009

Thursday 1/15/2009

Saturday 1/17/2009

Tuesday 1/20/2009

Thursday 1/22/2009

Saturday 1/24/2009

Tuesday 1/27/2009

Thursday 1/29/2009

Saturday 1/31/2009

Tuesday 2/2/2009

Thursday 2/4/2009

Saturday 2/6/2009

Tuesday 2/9/2009

Thursday 2/11/2009

Parts Needed To Buy

Please use the Shopping List Page!


Parts Needing To Be Made

Please use the Fabrication Page!


Subteam Issue Tracking 

Date Issue Description Needed By (subteam) Assigned To (subteam) Date Needed Complete
1/8 Need dimensions of surfaces where control system/electronics can be mounted Electrical Main Mech1, Mech 2, Drive 1/15 NO
1/8 Available space and dimensions from Inventor mockup
Mechanical 1
Mechanical 2
1/18 NO
1/13 Need to know what Sensors are needed Electrical, Programming Programming, Mechanical 1/18 NO
1/13 How are trapdoors defined? Programming Mechanical 1/18 NO
1/13 Need Control Box I/O’s Programming Elec Controls 1/21 NO
1/15 Determine if Encoder Wheel Needed Electrical/Mechanical Programming 1/17 YES
1/15 Help Port ProE into Inventor Drivetrain Mechanical 1/18 NO
1/17 Need to Weight Balance Mechanical Elec, Mechanical, Drive 1/31 NO