2010:Electrical Main: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 33: Line 33:
[[Electricla Main - 1.21.09|Electrical Main - 1.21.09]]<br>  
[[Electricla Main - 1.21.09|Electrical Main - 1.21.09]]<br>  


<br>
[[Electrical Main - 1.22.09]]
 
<br>  


== Component/Component Specifications  ==
== Component/Component Specifications  ==

Revision as of 17:51, 22 January 2009

Master To-Do List

  • Design "homemade" shaft encoder for conveyor motors.
  • Communicate sensor mountings to Mechanical teams.- Integration
  • How fast can we move the mouse and still not lose encoder counts.
  • Re-determine model positions
  • Order E7P Encoder
  • Assist Mechanical with Battery/CRio Mount
  • Get Set of Same Mice (backups)
  • Wire & Setup multiple Mice
  • Final Electrical Mounting Design
  • Design Protection for Electronics on Outside of Bot (or get help from Mechanical)
  • COMPLETE Bill of Materials


Electrical Main Subteam's Engineering Notebook

Week 1 - 42 Days Left!!

Electrical Main - 1.06.09
Electrical Main - 1.07.09
Electrical Main - 1.08.09
Electrical Main - 1.10.09

Electrical Main - 1.11.09

Week 2 -35 Days Left!!
Electrical Main - 1.13.09
Electrical Main - 1.14.09
Electrical Main - 1.15.09

Electrical Main - 1.17.09

Electrical Main - 1.18.09

Electrical Main - 1.20.09

Electrical Main - 1.21.09

Electrical Main - 1.22.09


Component/Component Specifications

Jaguar Speed Controllers

Victor 884 Speed Controllers

2009 KOP Motors Spreadsheet (Chief Delphi)

Motor Characteristics

Sensors

Servos

Micro Switches

Inventory

Electrical Board Inventor



Links to Other Subteams' Important Stuff

IO_Map


Electrical Fun

Defining Dave Apples and Dave Oranges!!


Please Label All Notebook Pages Electrical Main X.XX.2009 to avoid confusion.