2023:Electrical Main: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(add task)
Tag: visualeditor
(added beginning stuff for 1/24)
Tag: visualeditor
Line 82: Line 82:


* Accomplished
* Accomplished
**  
** Quality checked drive motor controllers
***  
* To-Do
* To-Do
**  
** Update IO Map
** Figure out sensors with Lift
** Finish rewiring CANcoder A (on black shelves) [?]
***  


=== 1/25/2023 ===
=== 1/25/2023 ===

Revision as of 15:35, 24 January 2023

General Electrical Info:

Terminating Wires:

For CAN: Green is Left/Ground, Yellow is Right

For Power: Black is Left/Ground, Red is Right

Breakers(All should be in the MPT):

With PDH:

20amp SnapAction

30amp SnapAction

40amp REV

Electrical Wiring Diagrams:

Optek Flag Sensor Wiring Diagram:


Optek Flag Sensor Wiring Diagram.png

Q10 Series Banner Sensor Wiring Diagram:

Q10 Series Banner Sensor Wiring Diagram.png

Wiring Diagram with Rev PDH

PDH.png

Wire Routing

  • Lift
    • Using the 1in IGUS chain x2 (1 for pneumatics and 1 for electrical) for extension
  • Gripper
    • Drive

Potential CAN Chain (1/21/23)

Daily Status

1/21/2023

  • Accomplished
    • Added power poles to shopping list
    • Added CANcoders to shopping list
    • Inspected Homer's swerve modules, found 2 suspect
    • Inventoried IGUS chain
      • Found 3 sets of end pieces
      • Pulled 2 44in lengths for use on 2023 robot (on black shelves)
    • Decided to use IGUS chain for extension
    • Rewired CANcoder B (on black shelves)
      • Discussed with Nick L and Berkeley about battery placement
  • To-Do
    • Finish rewiring CANcoder A (on black shelves)
    • Terminate and Label Motor Side and CAN Connection of Swerve Drive Spark Max (45A)
    • Terminate and Label Motor Side and CAN Connection of Swerve Rotation Spark Max (30A)
    • Continue to work with Lift/Gripper on sensor placement (ensure some level of adjustability)
    • Rough out locations of Speed Controllers
    • Update IO Map

1/22/2023

  • Accomplished
    • Wired, labeled, and CAN IDed the 8 drive motor controllers
    • Figuring out Battery Things
    • Talked with Acquire about beam break placement
    • Electrical Component placement in CAD started
    • Found an Ethernet Switch
  • To-Do
    • Update IO Map
    • Figure out sensors with Lift
    • Quality check motor controllers
    • Finish rewiring CANcoder A (on black shelves) [?]

1/24/2023

  • Accomplished
    • Quality checked drive motor controllers
  • To-Do
    • Update IO Map
    • Figure out sensors with Lift
    • Finish rewiring CANcoder A (on black shelves) [?]

1/25/2023

  • Accomplished
  • To-Do

1/26/2023

  • Accomplished
  • To-Do

1/28/2023

  • Accomplished
  • To-Do

1/29/2023

  • Accomplished
  • To-Do

1/31/2023

  • Accomplished
  • To-Do

2/1/2023

  • Accomplished
  • To-Do

2/2/2023

  • Accomplished
  • To-Do

2/4/2023

  • Accomplished
  • To-Do

2/5/2023

  • Accomplished
  • To-Do

2/7/2023

  • Accomplished
  • To-Do

2/8/2023

  • Accomplished
  • To-Do

2/9/2023

  • Accomplished
  • To-Do

2/11/2023

  • Accomplished
  • To-Do

2/12/2023

  • Accomplished
  • To-Do


Archives